✨ Regulatory and Trial Notices
NEW ZEALAND GAZETTE, No. 74 — 9 JULY 2015
trial site, where the signs must remain for a further month before speed and headway data is again measured at each site.
iii. The process in (a)(i) shall be repeated so that each supplementary sign is installed for a minimum of one month at each trial site.
b. For the temporary (orange (RF)) signs:
i. one of the trial supplementary signs may be installed below a W3-2 slippery surface warning sign at each of the three trial sites. After a minimum period of one month, speed and headway data may be measured.
ii. The process in (a)(ii) shall be followed and repeated so that each supplementary sign is installed for a minimum of one month at each trial site.
c. An evaluation and analysis must be undertaken as outlined in the trial application document received from Opus Research on 3 December 2014. An evaluation report must be sent to me by 30 June 2016.
Signed at Wellington this 2nd day of July 2015.
GLENN BUNTING, Network Manager.
Notice of Amendment to the Electricity Distribution Services Default Price-Quality Path
The Commerce Commission ("Commission") gives the following notice under Part 4 of the Commerce Act 1986 ("the Act").
Notice of Amendment
On 9 July 2015, the Commission made the Electricity Distribution Services (Powerco Limited) Default Price-Quality Path Amendment Determination 2015 [2015] NZCC 18 ("DPP Amendment Determination") under section 52Q of the Act.
The DPP Amendment Determination amends the quality standards and quality incentive scheme measures for Powerco Limited contained in the Electricity Distribution Services Default Price-Quality Path Determination 2015 [2014] NZCC 33.
The amended quality standards and quality incentive scheme measures applicable to Powerco Limited are set out below:
| SAIFI Limit | 2.520 |
| SAIFI Unplanned | |
| Boundary Value | 0.064 |
| SAIFI Target | 2.3406 |
| SAIFI Collar | 2.1615 |
| SAIFI Cap | 2.5197 |
Further Information
Copies of the determination as amended are available on the Commission’s website at
www.comcom.govt.nz
and are available for inspection free of charge at the Commission during ordinary office hours, or for purchase at a reasonable price at the Commission, 44 The Terrace, Wellington 6011.
Dated at Wellington this 9th day of July 2015.
COMMERCE COMMISSION.
Notice of Application Received by the Commerce Commission for Addition to the Register of Chorus’ Non-retail Users
Under section 69P(4) of the Telecommunications Act 2001, the Commerce Commission ("Commission") gives public notice of an application by Full Flavour Limited to be added to the Register of Chorus’ non-retail users.
44
Next Page →
✨ LLM interpretation of page content
🚂
Slippery When Wet Supplementary Signs Trial
(continued from previous page)
🚂 Transport & Communications2 July 2015
Traffic Control Devices, Slippery Surface Signs, Road Safety, Trial, W3-2, W14-7
- Glenn Bunting, Network Manager
🏭 Notice of Amendment to the Electricity Distribution Services Default Price-Quality Path
🏭 Trade, Customs & Industry9 July 2015
Electricity Distribution, Price-Quality Path, Powerco Limited, Commerce Commission
- Commerce Commission
🏭 Notice of Application Received by the Commerce Commission for Addition to the Register of Chorus’ Non-retail Users
🏭 Trade, Customs & IndustryTelecommunications, Chorus, Non-retail Users, Full Flavour Limited
- Commerce Commission
NZ Gazette 2015, No 74