Land Acquisition Notices




NEW ZEALAND GAZETTE. No. 75

17 JULY 2014

at all times, with or without such vehicles, machinery or materials for the purpose set out in the notice.

  1. Prior to commencement of the project, the Crown shall erect a temporary fence for the period of construction of the project to provide adequate security to the balance of the property.

  2. The Crown shall take all reasonable steps to minimise damage to the lease land arising from the Crown’s occupation under the lease and/or the execution of construction of the project.

  3. The Crown shall, at the expiration of the term, or any extended period taken in accordance with the lease, remove all debris arising from the Crown’s occupation under the lease together with any temporary fences, construction machinery, construction buildings, sheds, hardstands and other improvements required to be erected by the Crown during the lease. The Crown shall otherwise restore the lease land to a condition generally in keeping with the character of the lease land prior to entry. The Crown shall complete such work in a good and workmanlike manner.

The land is located at 109 Kapiti Road, Paraparaumu.

Dated at Wellington this 7th day of July 2014.

HON MICHAEL WOODHOUSE, Minister for Land Information.

ln4353

Notice of Intention to Take Land, an Interest in Land and a Leasehold Estate—State Highway 1 Wellington Northern Corridor (Mackays to Peka Peka Expressway), Kapiti Coast District

Notice is hereby given that the Minister for Land Information proposes to take, under the Public Works Act 1981, the land described in the First Schedule to this notice (“land”), an interest in land over the land described in the Second Schedule to this notice (“easement land”) on the terms and conditions set out in the Fourth Schedule to this notice (“easement”) and a leasehold estate (“lease”) in the land described in the Third Schedule (“lease land”) to this notice on the terms and conditions set out in the Fifth Schedule to this notice.

The land, the easement and the lease are required for construction of the State Highway 1 Wellington Northern Corridor (Mackays to Peka Peka Expressway) (“project”).

More particularly, the land, the easement (stormwater easement) and the lease are required for the functioning indirectly of a road.

The project is required to cater for increasing traffic volumes and to improve the safety and efficiency of State Highway 1 and the local road network.

The owner of the land and those persons with a registered interest in it have been served with notice of the Crown’s intention to take their land, and advised of their right to object.

Any other person having the right to object may send a written objection to the Registrar, Environment Court, 5th Floor, District Court Building, 49 Ballance Street, Wellington 6011, or by post to DX SX11154, Wellington, within 20 working days after the date of publication of this notice.

If any objection is made in accordance with this notice, a public hearing will be held with the right of the objector to appear and be heard personally unless the objector otherwise requires, and each objector will be informed of the time and place of the hearing.

Any person requiring further information in respect of this advice should contact Emilie Lardas, Opus International Consultants Limited, Level 6, Majestic Centre, 100 Willis Street, Wellington 6011. Postal Address: PO Box 12003, Wellington 6144. Telephone: (04) 471 7555.

Wellington Land District—Kapiti Coast District

First Schedule

Area Description
ha
0.9977 Part of Ngarara West B 3B Block (part Computer Freehold Register WN16B/638); shown as Section 1 on SO 470914.

Second Schedule

Easement in favour of the Crown for the functioning indirectly of a road (stormwater easement); shown as “B” on SO 470914.

Third Schedule

Area Description
ha
1.4415 Part of Ngarara West B 3B Block (part Computer Freehold Register WN16B/638); shown as Area 100A on SO 470914.
0.1522 Part of Ngarara West B 3B Block (part Computer Freehold Register WN16B/638); shown as Area 103A on SO 470914.

Fourth Schedule

Interpretation

The provisions of clauses 1, 2 and 10–14 of the Fourth Schedule of the Land Transfer Regulations 2002 are implied into this easement instrument except to the extent expressly provided for the contrary in this easement instrument.

In this easement instrument:

Easement Facility means the Stormwater manholes and Stormwater culvert.

Servient Land means Section 5 on SO 470914 (Computer Freehold Register WN16B/638).

Stipulated Area means that part of the Servient Land; shown marked “B” on SO 470914.

Stormwater culvert means the underground pipeline to be constructed by the grantee within the Stipulated Area.

Stormwater manholes means the circular underground concrete structures to be constructed by the grantee within the Stipulated Area. Each such manhole will be fitted with a solid cover and collects stormwater runoff and routes it through underground pipes. It is an access point for underground pipes maintenance.

The NZ Transport Agency may exercise any of the rights and powers of the grantee under this easement instrument.

Purpose

The purpose of the Easement Facility is to drain the stormwater runoff from the road (Wellington Northern Corridor Mackays to Peka Peka Expressway), following works carried out by the grantee, in the immediate vicinity of the Servient Land.

The grantee needs to ensure the unimpeded performance of the Easement Facility in perpetuity, and therefore needs to reserve certain rights in relation to the Easement Facility and impose certain obligations on the grantor in relation to the Servient Land.

The stormwater corridor, the Stormwater manholes and the Stormwater culvert are integral parts of the Easement Facility.

Grantor’s Obligations

The grantor may have access to and over the Stipulated Area subject to:



Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2014, No 75





✨ LLM interpretation of page content

🏗️ Notice of Intention to Take Land, an Interest in Land and a Leasehold Estate—State Highway 1 Wellington Northern Corridor (Mackays to Peka Peka Expressway), Kapiti Coast District (continued from previous page)

🏗️ Infrastructure & Public Works
7 July 2014
Land Acquisition, Public Works Act 1981, State Highway, Kapiti Coast District
  • HON MICHAEL WOODHOUSE, Minister for Land Information