✨ Transport and Telecommunications Notices
NEW ZEALAND GAZETTE, No. 148 — 11 DECEMBER 2014
intersection with Cross Street at RP 2/0.59 and extending in a generally northerly direction to finish at the current termination of the highway ramps on the south side of Reid Place at RP 2/0.78. The length of road to be revoked is approximately 0.19 kilometres.
Dated at Wellington this 5th day of December 2014.
GEOFF DANGERFIELD, Chief Executive, NZ Transport Agency.
2014-au7595
Notification of Commerce Commission’s Draft TSO Cost Calculation Determination for TSO Instrument for Telecommunications Relay Services for the Period Between 1 July 2013 and 30 June 2014
On 9 December 2014, pursuant to section 94F of the Telecommunications Act 2001 (“the Act”), the Commerce Commission (“Commission”) prepared a draft TSO cost calculation determination for the TSO instrument for telecommunications relay services for the hearing impaired and speech impaired, for the period between 1 July 2013 and 30 June 2014.
A copy of the draft determination is available on the Commission’s website at
www.comcom.govt.nz/regulated-industries/telecommunications/industry-levy-and-service-obligations/new-subsection-page-2/
The closing date for submissions on the draft determination is 17 December 2014 at 5.00pm.
Date of Notice: 11 December 2014.
COMMERCE COMMISSION.
2014-au7622
Electricity Industry (Exemption No. 222 (Body Corporate Power Limited)) Exemption Notice 2014
Pursuant to section 11 of the Electricity Industry Act 2010 (“Act”), the Electricity Authority gives the following notice.
Notice
- Title and commencement—(1) This notice is the Electricity Industry (Exemption No. 222 (Body Corporate Power Limited)) Exemption Notice 2014.
(2) This notice comes into force on the day after the date it is notified in the New Zealand Gazette.
-
Exemption—Body Corporate Power Limited (“Body Corporate Power”) is exempted from complying with the obligation in clause 15.38 of the Electricity Industry Participation Code 2010 (“Code”) to obtain and maintain certification.
-
Term—This exemption expires at the earlier of:
a. the close of 1 June 2015;
b. Body Corporate Power being responsible for more than 100 installation control points (“ICPs”); and
c. Body Corporate Power being responsible for an ICP with a metering installation category of 3, 4, or 5.
- Reasons for granting the exemption—The reasons for granting this exemption are:
a. granting the exemption meets the requirements in section 11(2) of the Act for granting exemptions;
b. the exemption is only needed on a short-term basis;
c. granting the exemption will assist a small new entrant retailer to enter the market, which could lead to increased competition for the long-term benefit of consumers;
d. Body Corporate Power will not have sufficient data to make an audit required for certification meaningful as some processes and procedures will not have been used in production; and
e. due to the small number of ICPs involved, the exemption will have little or no impact on other participants and service providers, and will not affect any other Code provisions.
47
Next Page →
✨ LLM interpretation of page content
🏗️
Revoking a Section of State Highway—State Highway 2, Tauranga
(continued from previous page)
🏗️ Infrastructure & Public Works5 December 2014
State Highway, Revocation, Land Transport, Tauranga
- Geoff Dangerfield, Chief Executive, NZ Transport Agency
🚂 Commerce Commission’s Draft TSO Cost Calculation Determination for Telecommunications Relay Services
🚂 Transport & Communications11 December 2014
Telecommunications, Relay Services, Cost Calculation, Commerce Commission
- Commerce Commission
🌾 Electricity Industry (Exemption No. 222 (Body Corporate Power Limited)) Exemption Notice 2014
🌾 Primary Industries & ResourcesElectricity, Exemption, Body Corporate Power Limited, Electricity Authority