40 NEW ZEALAND GAZETTE, No. 1 9 JANUARY 2014
(b) there would be a significant cost to replace the metering installations at the Ohaaki power station to comply with the obligation in clause 4(2)(a) of Schedule 10.7 of the Code;
(c) the derivation of submission information from the metering installations by subtraction is as accurate as it would be if it was derived using actual metered data and it was acceptable under the Code in the exact same configuration when the equipment was owned by the grid owner;
(d) the exemption from clause 4(2)(a) of Schedule 10.7 of the Code will allow AccuCal, as the metering equipment provider, to arrange certification of the existing metering installations at this ICP even though the metering configuration currently uses subtraction to determine submission information;
and
(e) the requested exemption will have no impact on any other participant or service provider, and will not affect any other Code provision.
Dated at Wellington this 23rd day of December 2013.
For and on behalf of the Electricity Authority:
DR THOMAS BRENT LAYTON, Chairperson, Electricity Authority.
au218
Electricity Industry (Exemption No. 191 (Contact Energy Limited)) Exemption Notice 2013
Pursuant to section 11 of the Electricity Industry Act 2010 (“Act”), the Electricity Authority gives the following notice.
Notice
- Title and commencement—(1) This notice is the Electricity Industry (Exemption No. 191 (Contact Energy Limited)) Exemption Notice 2013.
(2) This notice comes into force on the day after the date it is notified in the New Zealand Gazette.
-
Exemption—Contact Energy Limited (“Contact”) is exempted from compliance with the obligation in clause 10.24(c) of the Electricity Industry Participation Code 2010 (“Code”), in respect of the metering installations at installation control point 0000032431HR99C.
-
Term—This exemption expires at the earlier of:
(a) the close of 31 December 2023; and
(b) the completion date of a major upgrade to the Ohaaki substation.
- Reasons for granting the exemption—The reasons for granting this exemption are:
(a) granting the requested exemption meets the requirements in section 11(2) of the Act for granting exemptions;
(b) there would be a significant cost to replace the metering installations at the Ohaaki power station to comply with the obligation in clause 10.24(c) of the Code;
(c) the derivation of submission information by subtraction from the metering installations is as accurate as it would be if it was derived using actual metered data, and it was acceptable under the Code in the exact same configuration when the equipment was owned by the grid owner;
(d) the exemption from clause 10.24(c) of the Code will allow Contact to continue to use subtraction to determine submission information, even though the load is no longer directly connected to the grid; and
(e) the requested exemption will have no impact on any other participant or service provider, and will not affect any other Code provision.
Dated at Wellington this 23rd day of December 2013.
For and on behalf of the Electricity Authority:
DR THOMAS BRENT LAYTON, Chairperson, Electricity Authority.
au217
Electricity Industry (Levy of Industry Participants) Regulations 2010
Notice of Reconciled Annual Levy Rates for the Financial Year Ended 30 June 2013
Pursuant to Regulation 11(1)(c) of the Electricity Industry (Levy of Industry Participants) Regulations 2010 (“Regulations”), the Electricity Authority (“Authority”) gives the following notice.
Notice
-
Title—This notice is the Notice of Reconciled Annual Levy Rates for the Financial Year Ended 30 June 2013.
-
Reconciled levy rates—(1) The Authority has calculated the reconciled annual levy rates for the financial year ended 30 June 2013 in accordance with Regulation 11 of the Regulations, as follows:
| Generators | Purchasers | Retailers | Distributors (including Transpower) | Distributors (excluding Transpower) | Transpower | |
|---|---|---|---|---|---|---|
| Common quality operations | $0.1632/MWh | $0.1644/MWh | $0.0910/MWh | |||
| Market operations | $0.4021/MWh | $0.4049/MWh | ||||
| Registry and consumer operations | $0.3139/ICP | $0.3140/ICP | ||||
| Supply reliability operations | $0.0072/MWh | |||||
| Transmission operations | $0.0548/MWh |
Next Page →
✨ LLM interpretation of page content
🏭
Electricity Industry (Exemption No. 187 (AccuCal Limited)) Exemption Notice 2013
(continued from previous page)
🏭 Trade, Customs & Industry23 December 2013
Electricity Industry, Exemption, AccuCal Limited, Metering Installations, Ohaaki Substation
- DR THOMAS BRENT LAYTON, Chairperson, Electricity Authority
🏭 Electricity Industry (Exemption No. 191 (Contact Energy Limited)) Exemption Notice 2013
🏭 Trade, Customs & Industry23 December 2013
Electricity Industry, Exemption, Contact Energy Limited, Metering Installations, Ohaaki Substation
- DR THOMAS BRENT LAYTON, Chairperson, Electricity Authority
🏭 Notice of Reconciled Annual Levy Rates for the Financial Year Ended 30 June 2013
🏭 Trade, Customs & IndustryElectricity Industry, Levy Rates, Financial Year, Generators, Purchasers, Retailers, Distributors, Transpower
NZ Gazette 2014, No 1