4212 NEW ZEALAND GAZETTE, No. 143 30 NOVEMBER 2012

Statement of Performance Measures

For the Year ended 30 June 2012
For the purposes of the Gas (Information Disclosure) Regulations 1997
Regulations 15, 17, & 18

Reference 2012 2011 2010 2009 2008

1. Financial Performance Measures

| Accounting Return on Total Assets | Sch 1 Pt 2.1(a) | 10.16% | 10.54% | 11.74% | 10.13% | 7.58% |
| Accounting Return on Equity | Sch 1 Pt 2.1(b) | 12.78% | 10.86% | 12.69% | 11.81% | 11.37% |
| Accounting Rate of Profit Including Network Revaluation | Sch 1 Pt 2.1(c) | 9.66% | 10.00% | 10.99% | 9.28% | 11.12% |
| Accounting Rate of Profit Excluding Network Revaluation | | 9.66% | 10.00% | 10.99% | 9.28% | 8.12% |

Note: The Accounting Rate of Profit Excluding Network Revaluation is not required by the Gas (Information Disclosure) Regulations 1997.

2. Efficiency Performance Measures

| Direct Line Costs per Kilometre | Sch 1 Pt 2.2(a) | $1,766 | $1,759 | $1,711 | $2,337 | $2,916 |
| Indirect Line Costs per Gas Customer | Sch 1 Pt 2.2(b) | $100 | $95 | $99 | $82 | $84 |

3. Energy Delivery Efficiency Performance Measures

| Load Factor | Sch 1 Pt 3.1(a) | 86.39% | 86.93% | 79.30% | 69.70% | 80.10% |
| Unaccounted for Gas Ratio | Sch 1 Pt 3.1(b) | 1.26% | 1.25% | 0.48% | 1.18% | 1.80% |

4. Statistics

| System Length (km) | Sch 1 Pt 3.2(a) | 388 | 387 | 386 | 384 | 368 |
| Maximum Monthly Amount of Gas Entering System (GJ) | Sch 1 Pt 3.2(b) | 113,352 | 112,630 | 106,117 | 114,968 | 107,645 |
| Total Annual Amount of Gas Conveyed through System (GJ) | Sch 1 Pt 3.2(c) | 1,750,661 | 1,174,868 | 1,094,511 | 961,934 | 1,034,957 |
| Total Annual Amount of Gas Conveyed through System for Persons not in a Prescribed Business Relationship (GJ/Gjpa) | Sch 1 Pt 3.2(d) | 922,857 | 952,133 | 742,414 | 514,832 | 542,665 |
| Total Number of Customers | Sch 1 Pt 3.2(e) | 10,338 | 10,353 | 10,309 | 10,267 | 10,331 |

5. Reliability Performance Measures

| Unplanned Transmission System Interruptions (hours) | Sch 1 Pt 4.1 | nil | nil | nil | nil | nil |
| Unplanned Distribution System Interruptions not related to Transmission System Interruptions (hours/customer) | Sch 1 Pt 4.2(a) | 0.0106 | 0.0127 | 0.2542 | 0.0258 | 0.018 |
| Unplanned Distribution System Interruptions related to Transmission System Interruptions (hours/customer) | Sch 1 Pt 4.2(b) | nil | nil | nil | nil | nil |
| Unplanned Distribution System Interruptions as a result of third party damage (hours/customer) | | 0.0038 | 0.0076 | 0.0121 | 0.062 | 0.0116 |
| Unplanned Distribution System Interruptions not as a result of third party damage (hours/customer) | | 0.0068 | 0.0051 | 0.0058 | 0.0058 | 0.0064 |

Note: The last two performance measures are not required by the Gas (Information Disclosure) Regulations 1997.

  1. The increase in percentage is due to the revaluation carried out during the year and the reversal of the subvention payment.

  2. The increase in Unplanned Distribution System Interruptions not related to Transmission System Interruptions was due to water inundation outage in St Johns Hill Wanganui in late June 2010. This single significant event was caused by a leaking water pipe and contributed 0.225 hours/customer. Without that event the measure would have been 0.0296.

  3. The decrease is due to there being no significant interruptions to the network during 2010/2011.



Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2012, No 143





✨ LLM interpretation of page content

🌾 Statement of Performance Measures for Gas Industry

🌾 Primary Industries & Resources
Gas, Financial Performance, Efficiency, Energy Delivery, Reliability, Statistics