Electricity Performance Measures




The Electricity Information Disclosure Requirements¹

(For 12 months ending 30 June 2012, 2011, 2010 and 2009)

Part 4

Energy Delivery Efficiency Performance Measures and Statistics

Disclosure under Requirement 20

  1. Energy delivery efficiency performance measures

    (a) Load factor.(%)

    Electrical energy entering the transmission system as percentage of maximum demand times hours per year

    2011/12 2010/11 2009/10 2008/09
    66.51 69.47 68.49 67.02

    (b) Loss ratio.(%)

    Transmission losses as percentage of energy entering the system

    2011/12 2010/11 2009/10 2008/09
    3.76 3.79 3.72 4.02

    (c) Capacity utilisation.(%)

    Maximum demand as percentage of total transformer capacity

    2011/12 2010/11 2009/10 2008/09
    47.34 45.28 46.27 46.93
  2. Statistics

    (a) System length down by voltage (km)

    Total 17,094 17,198 17,348 17,340
    350 kV 611 611 611 614
    270 kV (HVDC) 611 611 611 611
    0 kV (HVDC earth electrode) 31 31 31 31
    220 kV (HVAC) 8,639 8,642 8,642 8,632
    110 kV (HVAC) 6,157 6,152 6,302 6,304
    66/50/33/11 kV (HVAC)ᵃ 1,045 1,151 1,151 1,151

    (b) Circuit length of overhead electric lines, broken down by voltage (km)

    Totalᵃ 17,003 17,108 17,256 17,255
    350 kV (HVDC) 571 571 571 574
    270 kV (HVDC) 571 571 571 571
    0 kV (HVDC earth electrode) 31 31 31 31
    220 kV (HVAC) 8,639 8,642 8,642 8,632
    110 kV (HVAC) 6,146 6,142 6,290 6,294
    66/50/33/11 kV (HVAC)ᵃ 1,045 1,151 1,151 1,151

    NB: HVDC link submarine power cables measure approximately 40 km.

    (c) Total circuit length of underground electric lines (km)

    | (110 kV HVAC) | 11 | 11 | 11 | 4 |

    (d) Transformer capacity (kVA)

    | | 14.61x10⁶ | 14.51x10⁶ | 14.26x10⁶ | 14.09x10⁶ |

    (e) Maximum demand. (kilowatts)ᵇᵒ (kW)

    | | 6.92x10⁶ | 6.57x10⁶ | 6.60x10⁶ | 6.61x10⁶ |

    (f) Total electricity entering the system (before losses).ᵇᵒ (kWh)

    | | 39.70x10⁹ | 39.98x10⁹ | 39.58x10⁹ | 38.82x10⁹ |

    (g) Total amount of electricity (in kilowatt hours) supplied from the system (after losses of electricity) during the financial year on behalf of each person that is an electricity generator or an electricity retailer, or both.ᵈ (kWh)

    | | 38.21x10⁹ | 38.47x10⁹ | 38.10x10⁹ | 37.26x10⁹ |

    (h) Total connected customers

    | | 53 | 53 | 53 | 51 |

Notes

a Excludes 61 km of circuits leased from others and operated by Transpower.
b To 2 decimal places only, higher accuracy used in calculations.
c For all years, figures for maximum demand kW and kWh injected and supplied include loads on circuits leased by Transpower. The effect of these circuits cannot be measured as metering equipment is not installed at the inter-connection points with Transpower-owned assets, but the difference is estimated to be no more than 0.1% of totals. Loads on Transpower assets leased to others are not included, as Transpower does not collect operational data for these assets.
d Including sales to direct connected customers
e Minor corrections to previously disclosed 2010/11 data.

¹ Electricity Information Disclosure Requirements issued 31 March 2004 as amended by the Electricity Information Disclosure Amendment Requirements 2004, 2006, 2007, 2008 (No2), and 2008 (No3).



Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2012, No 140





✨ LLM interpretation of page content

🏭 Transpower New Zealand Limited Financial Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Financial Measures, Efficiency Measures, Return on Equity, Return on Funds, Return on Investment

🏭 Energy Delivery Efficiency Performance Measures and Statistics

🏭 Trade, Customs & Industry
Energy efficiency, Load factor, Loss ratio, Capacity utilisation, System length, Circuit length, Transformer capacity, Maximum demand, Electricity supply