✨ Resource Consents and Lease Registrations
Registered Lease 5844264.1 - Switchyard lease to Transpower New Zealand Limited – Tekapo A CIR 122797 issued as a result.
Registered lease 5844264.2 - Switchyard lease to Transpower New Zealand Limited – Tekapo B CIR 122798 issued as a result.
Part E – Resource Consents
| Consent Reference | Description |
|---|---|
| Tekapo A | |
| CRC905301.2 | Dam Tekapo River |
| CRC905302.2 | Take up to 130 cumecs from Lake Tekapo |
| CRC905303.1 | Take up to 386 cubic metres of water per day from a Spring for domestic supply |
| CRC905304.1 | Discharge water up to rate of 850 cumecs into Tekapo River via Tekapo Control Structure |
| CRC905305.1 | Use water up to 130 cumecs for power generation |
| CRC905306.2 | Dam Tekapo River |
| CRC905307.1 | Divert water up to 130 cumecs from Tekapo River into Tekapo-Pukaki canal |
| CRC905308.1 | Take water up to 130 cumecs from Tekapo River into Tekapo-Pukaki canal |
| CRC905309.1 | Discharge water up to 600 cumecs to Tekapo River via Lake George Scott Control Weir to control lake levels |
| Tekapo B | |
| CRC905310.1 | Divert water of Fork Stream through a culvert under Tekapo-Pukaki canal |
| CRC905311.1 | Divert water from Irishman’s Creek through a culvert under Tekapo-Pukaki canal |
| CRC905312.1 | Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal |
| CRC905313.1 | Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal |
| CRC905314.1 | Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal |
| CRC905315.1 | Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal |
| CRC905316.1 | Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal |
| CRC905317.1 | Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal |
| CRC905318.1 | Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal |
| CRC905319.1 | To use water up to a maximum rate of 130 cubic metres per second at about Tekapo B Power Station |
| CRC905320.1 | To discharge water up to a maximum rate of 130 cubic metres per second into Lake Pukaki via Tekapo B Power Station Tailrace |
| Global Culverts | |
| RM030034 | Culvert alteration, repair, replacement and maintenance works at various locations to the extent relating to the Land |
| CRCO32260 | Use, erect, reconstruct, place, alter, extend remove or demolish a permanent structure in, on or over the bed of a water course, at various locations to the extent relating to the Land |
Next Page →
✨ LLM interpretation of page content
🗺️
Derivation of Title and Outstanding Core Land Matters
(continued from previous page)
🗺️ Lands, Settlement & SurveyLand transfer, Easements, Tekapo A Tunnel, Tekapo Control Gates, MacKenzie District Council, ECNZ, Electricity Act 1992
🗺️ Registered Lease for Switchyard to Transpower New Zealand Limited
🗺️ Lands, Settlement & SurveyLease, Switchyard, Transpower New Zealand Limited, Tekapo A, Tekapo B
🗺️ Resource Consents for Tekapo A and Tekapo B
🗺️ Lands, Settlement & SurveyResource Consents, Dam, Water Take, Discharge, Power Generation, Tekapo River, Lake Tekapo, Tekapo-Pukaki canal, Lake Pukaki
NZ Gazette 2011, No 93