Resource Consents and Lease Registrations




Registered Lease 5844264.1 - Switchyard lease to Transpower New Zealand Limited – Tekapo A CIR 122797 issued as a result.

Registered lease 5844264.2 - Switchyard lease to Transpower New Zealand Limited – Tekapo B CIR 122798 issued as a result.

Part E – Resource Consents

Consent Reference Description
Tekapo A
CRC905301.2 Dam Tekapo River
CRC905302.2 Take up to 130 cumecs from Lake Tekapo
CRC905303.1 Take up to 386 cubic metres of water per day from a Spring for domestic supply
CRC905304.1 Discharge water up to rate of 850 cumecs into Tekapo River via Tekapo Control Structure
CRC905305.1 Use water up to 130 cumecs for power generation
CRC905306.2 Dam Tekapo River
CRC905307.1 Divert water up to 130 cumecs from Tekapo River into Tekapo-Pukaki canal
CRC905308.1 Take water up to 130 cumecs from Tekapo River into Tekapo-Pukaki canal
CRC905309.1 Discharge water up to 600 cumecs to Tekapo River via Lake George Scott Control Weir to control lake levels
Tekapo B
CRC905310.1 Divert water of Fork Stream through a culvert under Tekapo-Pukaki canal
CRC905311.1 Divert water from Irishman’s Creek through a culvert under Tekapo-Pukaki canal
CRC905312.1 Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal
CRC905313.1 Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal
CRC905314.1 Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal
CRC905315.1 Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal
CRC905316.1 Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal
CRC905317.1 Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal
CRC905318.1 Divert water from an unnamed stream through a culvert under Tekapo-Pukaki canal
CRC905319.1 To use water up to a maximum rate of 130 cubic metres per second at about Tekapo B Power Station
CRC905320.1 To discharge water up to a maximum rate of 130 cubic metres per second into Lake Pukaki via Tekapo B Power Station Tailrace
Global Culverts
RM030034 Culvert alteration, repair, replacement and maintenance works at various locations to the extent relating to the Land
CRCO32260 Use, erect, reconstruct, place, alter, extend remove or demolish a permanent structure in, on or over the bed of a water course, at various locations to the extent relating to the Land


Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2011, No 93





✨ LLM interpretation of page content

🗺️ Derivation of Title and Outstanding Core Land Matters (continued from previous page)

🗺️ Lands, Settlement & Survey
Land transfer, Easements, Tekapo A Tunnel, Tekapo Control Gates, MacKenzie District Council, ECNZ, Electricity Act 1992

🗺️ Registered Lease for Switchyard to Transpower New Zealand Limited

🗺️ Lands, Settlement & Survey
Lease, Switchyard, Transpower New Zealand Limited, Tekapo A, Tekapo B

🗺️ Resource Consents for Tekapo A and Tekapo B

🗺️ Lands, Settlement & Survey
Resource Consents, Dam, Water Take, Discharge, Power Generation, Tekapo River, Lake Tekapo, Tekapo-Pukaki canal, Lake Pukaki