8 JUNE 2011 NEW ZEALAND GAZETTE, No. 80 1879

Disclosure under the Gas (Information Disclosure) Regulations 1997
Maui Development Limited
May 2011

3.3 Statistics

Oct-Dec 2005 Jan-Dec 2006 Jan-Dec 2007 Jan-Dec 2008 Jan-Dec 2009 Jan-Dec 2010
System Length (km) 308.77 308.277 308.277 308.277 308.277 308.277
Maximum Monthly Flow (GJ) 8,148,000 10,834,000 13,523,931 13,035,190 12,487,882 12,144,460
Total Amount of Gas Conveyed (GJ) 23,657,000 114,627,000 137,116,559 133,152,233 134,266,062 128,637,477
Total Amount of Gas Conveyed for Wholesalers or Retailers (GJ) 18,188,000 79,101,000 81,278,360 82,889,762 104,170,089 66,179,474
Total Customers 4.0 10.5 13.0 13.0 12.5 12.0

4. REGULATION 18: RELIABILITY PERFORMANCE MEASURES

4.1 Estimates, Assumptions and Adjustments

For the Maui pipeline, unplanned interruptions have been counted in four ways:

  1. An interruption in the supply of Maui gas into the pipeline, whether or not there was any effect on users. Figures are available up to the end of October 2006. This measure became inadequate as substantial amounts of gas from non-Maui sources became available.

  2. A curtailment of a nominated shipment through the pipeline for any reason. This measure has been used since November 2006. The possible reasons for curtailment include matters outside the pipeline operator's control such as failure of a party to supply gas as scheduled, or failure of a party to take gas from the pipeline as scheduled, or force majeure events affecting pipeline delivery or off take. A curtailment may only affect some pipeline customers, with others unaffected.

  3. A curtailment or interruption due to the failure of the pipeline or pipeline equipment. There have been no failures of this type in the periods reported on.

  4. High pressure incidents considered are those that required curtailment to mitigate an over pressure situation.

Records kept using the different methods are not directly comparable.



Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2011, No 80





✨ LLM interpretation of page content

🏭 Maui Development Limited Gas Disclosure (continued from previous page)

🏭 Trade, Customs & Industry
Gas, Disclosure, Regulations, Maui Development Limited, Pipeline, Statistics, Reliability Performance Measures, Interruptions, Curtailments