5354 NEW ZEALAND GAZETTE, No. 184 28 NOVEMBER 2011

The Electricity Information Disclosure Requirements

(For 12 months ending 30 June 2011, 2010, 2009, and 2008)

Part 4

Energy Delivery Efficiency Performance Measures and Statistics

(Disclosure under Requirement 20)

1. Energy delivery efficiency performance measures

(a) Load factor (%)
Electrical energy entering the transmission system as percentage of maximum demand times hours per year

2010/11 2009/10 2008/09 2007/08
69.47 68.49 67.02 68.35

(b) Loss ratio (%)
Transmission losses as percentage of energy entering the system

2010/11 2009/10 2008/09 2007/08
3.79 3.72 4.02 3.66

(c) Capacity utilisation (%)
Maximum demand as percentage of total transformer capacity

2010/11 2009/10 2008/09 2007/08
45.28 46.27 46.93 48.10

2. Statistics

(a) System length, broken down by voltage (km)

2010/11 2009/10 2008/09 2007/08
Total a 17,198 17,348 e 17,340 17,333
350 kV (HVDC) 611 611 611 611
270 kV (HVDC) 611 611 611 611
0 kV (HVDC earth electrode) 31 31 31 31
220 kV (HVAC) 8,642 8,642 e 8,632 8,631
110 kV (HVAC) 6,152 6,302 6,304 6,298
66/50/33/11 kV (HVAC) a 1,151 1,151 e 1,151 1,151

(b) Circuit length of overhead electric lines, broken down by voltage (km)

2010/11 2009/10 2008/09 2007/08
Total a 17,108 17,256 e 17,255 17,248
350 kV (HVDC) 571 571 571 571
270 kV (HVDC) 571 571 571 571
0 kV (HVDC earth electrode) 31 31 31 31
220 kV (HVAC) 8,642 8,642 e 8,632 8,631
110 kV (HVAC) 6,142 6,290 6,299 6,293
66/50/33/11 kV (HVAC) a 1,151 1,151 e 1,151 1,151

NB: HVDC link submarine power cables measure approximately 80km. Broken down by voltage

2010/11 2009/10 2008/09 2007/08
350 kV (HVDC) 40 40 40 40
270 kV (HVDC) 40 40 40 40

(c) Total circuit length of underground electric lines (km)

2010/11 2009/10 2008/09 2007/08
(110 kV HVAC) 11 11 4 4

(d) Transformer capacity (kVA)

2010/11 2009/10 2008/09 2007/08
14.51x106 14.26x106 14.09x106 13.80x106

(e) Maximum demand (kilowatts) bc (kW)

2010/11 2009/10 2008/09 2007/08
6.57x106 6.60x106 6.61x106 6.64x106

(f) Total electricity entering the system (before losses) bc (kWh)

2010/11 2009/10 2008/09 2007/08
39.98x109 39.58x109 38.82x109 39.72x109

(g) Total amount of electricity (in kilowatt hours) supplied from the system (after losses of electricity) during the financial year on behalf of each person that is an electricity generator or an electricity retailer, or both. bc (kWh)

2010/11 2009/10 2008/09 2007/08
38.47x109 38.10x109 37.26x109 38.27x109

(h) Total connected customers

2010/11 2009/10 2008/09 2007/08
53 53 51 49

Notes

a Excludes 61km of circuits leased from others and operated by Transpower.
b To 2 decimal places only, higher accuracy used in calculations.
c For all years, figures for maximum demand kW and kWh injected and supplied include loads on circuits leased by Transpower. The effect of these circuits cannot be measured as metering equipment is not installed at the inter-connection points with Transpower-owned assets, but the difference is estimated to be no more than 0.1% of totals. Loads on Transpower assets leased to others are not included as Transpower does not collect operational data for these assets.
d Including sales to direct connected customers
e Minor corrections to previously disclosed 2009/10 data.



Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2011, No 184





✨ LLM interpretation of page content

πŸ’° Annual Depreciated Historic Cost Reconciliation Report for Transpower New Zealand Limited Lines Business (continued from previous page)

πŸ’° Finance & Revenue
Financial report, Depreciated historic cost, System fixed assets, Impairments

🌾 Energy Delivery Efficiency Performance Measures and Statistics

🌾 Primary Industries & Resources
Electricity, Energy delivery, Load factor, Loss ratio, Capacity utilisation, System length, Circuit length, Transformer capacity, Maximum demand, Electricity supply