Transport and Maritime Notices




NEW ZEALAND GAZETTE, No. 53

23 APRIL 2009

Authorities and Other Agencies of State Notices

Maritime New Zealand

Submarine Cables and Pipelines Protection Act 1996

Declaration Under the Submarine Cables and Pipelines Protection Act 1996

Whereas, pursuant to section 441 of the Maritime Transport Act 1994, the Minister of Transport did delegate the power under section 12(6) of the Submarine Cables and Pipelines Protection Act 1996 to Maritime New Zealand, by an instrument of delegation dated 19 March 1997.

And whereas, pursuant to section 442 of the Maritime Transport Act 1994 and section 73 of the Crown Entities Act 2004, Maritime New Zealand did delegate the power under section 12(6) of the Submarine Cables and Pipelines Protection Act 1996 to the Director of Maritime New Zealand, by an Instrument of Delegation dated 17 January 2008.

Therefore I, Catherine Taylor, Director of Maritime New Zealand, hereby declare as follows:

The Submarine Cables and Pipelines Protection Order 2009 shall not apply to the following ship:

Seatow 80

in respect of the protected area designated “Area 2 – Hauraki”, when that vessel is anchored in the Hauraki Gulf off Mairangi Bay at locations approved by Telecom New Zealand Limited, and when that vessel is being operated in compliance with Construction Execution Procedure 7941-621-057.

This declaration is in effect from 14 April 2009 until 22 May 2009.

Dated at Wellington this 14th day of April 2009.

CATHERINE TAYLOR, Director of Maritime New Zealand.

au3409

NZ Transport Agency

Land Transport Rule: Traffic Control Devices 2004

Alternative Pedestrian Traffic Signal Display Trial

Pursuant to subclause 3.4(1) of the Land Transport Rule: Traffic Control Devices 2004 (the Rule) and pursuant to a sub-delegation to me by the New Zealand Transport Agency, I, Lyndon Bryan Hammond, National Manager Network Management, hereby authorise the installation and maintenance of an alternative pedestrian traffic signal display:

(i) for the purpose described in Schedule 1;

(ii) in the form, layout, and operation set out in Schedule 2;

(iii) at the locations stated in Schedule 3;

(iv) for the period specified in Schedule 4; and

(v) subject to the terms and conditions detailed in Schedule 5.

This alternative pedestrian traffic signal display shall be used for the purpose of evaluating its use and the experiment shall be called the “Alternative pedestrian traffic signal display trial”.

Schedule 1—Purpose of trial

The purpose of the trial is to evaluate the effectiveness and safety of alternative mid block pedestrian traffic signal displays situated on the nearside of the roadway with smaller displays than those required by Schedule 3 of the Rule and a pedestrian signal display sequence different to the requirements of subclause 6.6(4) of the Rule.

Schedule 2—Form, layout, sensors and operation of displays

Form:

The alternative pedestrian displays will be of a similar shape to those specified drawings S3-1.1 and S3-2.1 in Schedule 3 of the Rule but with a human figure height of 100mm and may be located within a rectangular lantern without meeting the requirements specified for light emitting diodes.

Layout:

The alternative pedestrian displays will be located immediately above a pedestrian call button complying with AS 2353-1999 Pedestrian push-button assemblies, and on the same side of the road as a pedestrian who wishes to cross that road and orientated to face that pedestrian, to the pedestrian’s right hand side.

Operation:

The pedestrian signals shall operate as set out in clause 6.6(4) of the Rule except that during the period after the green man is shown, a steady red man shall be shown during the period which a pedestrian is expected to finish crossing the roadway and the vehicle lights continue to show a full red signal.

Schedule 3—Location

The site approved for this trial is at Railway Avenue, Lower Hutt.

Schedule 4—Period of trial

The trial shall start after 1 May 2009 and end by 31 October 2009.

Schedule 5—Conditions

An evaluation will be undertaken consisting of:

(i) a before and after safety analysis as outlined in the proposal received from Opus Central laboratories dated 3 April 2009 with the title “Evaluation of a near side Puffin display”; and

(ii) a survey of users.

The evaluation reports shall be received by me by 30 June 2009.

Dated at Wellington this 21st day of April 2009.

LYNDON BRYAN HAMMOND, National Manager Network Management.

au3556



Next Page →



Online Sources for this page:

Gazette.govt.nz PDF NZ Gazette 2009, No 53





✨ LLM interpretation of page content

🚂 Declaration Under the Submarine Cables and Pipelines Protection Act 1996

🚂 Transport & Communications
14 April 2009
Maritime New Zealand, Submarine Cables, Pipelines Protection, Hauraki Gulf, Seatow 80
  • Catherine Taylor, Director of Maritime New Zealand

🚂 Alternative Pedestrian Traffic Signal Display Trial

🚂 Transport & Communications
21 April 2009
NZ Transport Agency, Traffic Control Devices, Pedestrian Signals, Trial, Lower Hutt
  • Lyndon Bryan Hammond, National Manager Network Management