✨ Scanpower Limited Performance Measures




5 MARCH 2008 NEW ZEALAND GAZETTE, No. 52

1461

Scanpower Limited

Performance Measures Continued

For the Year Ended 31 March 2007

Line Voltage / Target 2008 2008/2012
11kV 8.00 8.00

Sub Requirement 6. Faults per 100 Circuit Kilometres (Underground)

Line Voltage 2007 2006 2005 2004 2003
11kV Underground 0 0 0 0 0

Sub Requirement 7. Faults per 100 Circuit Kilometres (Overhead)

Line Voltage 2007 2006 2005 2004 2003
11kV Overhead 4.24 6.94 8.04 17.27 5.59

Sub Requirement 8, 9, 10, 11. SAIDI Results by Class and Targets

Class A B C D E F G TOTAL
2007 SAIDI 0.00 26.14 20.53 0.00 0.00 0.00 0.00 46.67
2006 SAIDI 0.00 32.31 36.28 0.00 0.00 0.00 0.00 68.59
2005 SAIDI 0.00 38.82 32.49 0.00 0.00 0.00 0.00 71.31
2004 SAIDI 0.00 33.96 151.24 0.00 0.00 0.00 0.00 185.20
2003 SAIDI 28.44 24.80 57.23 0.00 0.00 0.00 0.00 110.47
Class / Target 2008 2008/2012
SAIDI Class B 30.00 30.00
SAIDI Class C 45.00 45.00

Sub Requirement 12, 13, 14, 15. SAIFI Results by Class and Targets

Class A B C D E F G TOTAL
2007 SAIFI 0.00 0.20 0.64 0.00 0.00 0.00 0.00 0.84
2006 SAIFI 0.00 0.29 0.69 0.00 0.00 0.00 0.00 0.98
2005 SAIFI 0.00 0.29 0.54 0.00 0.00 0.00 0.00 0.83
2004 SAIFI 0.00 0.26 1.41 0.00 0.00 0.00 0.00 1.67
2003 SAIFI 0.24 0.18 0.56 0.00 0.00 0.00 0.00 0.98
Class / Target 2008 2008/2012
SAIFI Class B 0.25 0.25
SAIFI Class C 0.60 0.60


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2008, No 52


Gazette.govt.nz PDF NZ Gazette 2008, No 52





✨ LLM interpretation of page content

πŸ’° Scanpower Limited Performance Measures Continued (continued from previous page)

πŸ’° Finance & Revenue
Performance Measures, Retailers, Consumers, Interruptions, Reliability, Scanpower Limited