✨ Energy network statistics




ALPINE ENERGY LIMITED LINES BUSINESS

Reliability and Performance Measures

System Average Interruption Duration Index (SAIDI) - 31 March 2007

Class 2009/12 (Target) 2008 (Target) 2007 2006 2005 2004
SAIDI for total number of interruptions 1.38 81 80 116
Class A 15 15 14 17 9 0
Class B 15 15 70 8 12 12
Class C 66 66 987 50 57 103
Class D 67 5 2 0
Class E - I 0 0 0 0

| | | | | | | |
| a = sum of interruption duration factors for all interruptions within the particular interruption class | | | | | | |
| Class A | 240,000 | 240,000 | 401,940| 510,026| 262,560| 0 |
| Class B | 1,500,000 | 1,500,000 | 2,042,373| 239,831| 339,577| 350,995|
| Class C | | | 28,996,163| 1,459,270| 1,630,077| 2,935,049|
| Class D | | | 1,970,319| 142,774| 51,508 | 0 |
| Class E - I | | | 0 | 0 | 0 | 0 |
| b = Total Consumers | | | 29,367 | 29,163| 28,697| 28,409|

System Average Interruption Frequency Index (SAIFI) - 31 March 2007

Class 2009/12 (Target) 2008 (Target) 2007 2006 2005 2004
SAIFI for total number of interruptions 2.5 1.3 1.0 1.6
Class A 0.1 0.1 0.0 0.0 0.0 0.0
Class B 0.1 0.1 0.3 0.1 0.1 0.1
Class C 1.2 1.2 1.5 1.0 0.9 1.5
Class D 0.7 0.1 0.0 0.0
Class E - I 0.0 0.0 0.0 0.0

| | | | | | | |
| a = sum of electricity consumers affected by all interruptions | | | | | | |
| Class A | | | 470 | 1,068| 450 | 0 |
| Class B | | | 7,800| 3,600| 2,640| 3,930|
| Class C | | | 45,000| 29,000| 24,700| 41,406|
| Class D | | | 19,200| 3,900| 907 | 0 |
| Class E - I | | | 0 | 0 | 0 | 0 |
| b = Total Consumers | | | 29,367| 29,163| 28,697| 28,409|

Connection Average Interruption Duration Index (CAIDI) - 31 March 2007

Class 2009/12 (Target) 2008 (Target) 2007 2006 2005 2004
CAIDI for total number of interruptions 461 63 80 72
Class A 85 85 855 478 583 0
Class B 262 262 262 67 129 89
Class C 62 62 644 50 66 71
Class D 103 37 57 0
Class E - I 0 0 0 0


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2008, No 47


Gazette.govt.nz PDF NZ Gazette 2008, No 47





✨ LLM interpretation of page content

🏭 Alpine Energy Limited Lines Business Network Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy network, Statistics, System length, Circuit length, Transformer capacity, Electricity supply, Consumers, Reliability, Performance measures, SAIDI, SAIFI, CAIDI