26 FEBRUARY 2008 NEW ZEALAND GAZETTE, No. 39 921

VECTOR LIMITED

ELECTRICITY LINES BUSINESS

RELIABILITY PERFORMANCE MEASURES TO BE DISCLOSED BY DISCLOSING ENTITIES

(OTHER THAN TRANSPOWER) (CONTINUED)

FOR THE YEAR ENDED 31 MARCH 2007

SCHEDULE 1 – PART 5 (continued)

5. Faults per 100 circuit kilometres of prescribed voltage electric line

2007 2006 2005 2004
(a) The total number of faults 16.19 15.22 12.56 14.91
2008
(b) The total number of targeted faults 14.72
2008-2012
(c) The average total number of faults 14.72

(d) Breakdown of (a) to (c) according to line voltage

6.6kV 11kV 22kV 33kV 110kV Total
(a) 2007 11.73 17.00 10.97 10.71 5.52 16.19
(b) 2008 16.13 15.55 8.23 8.74 4.41 14.72
(c) 2008-2012 - 15.55 8.23 8.74 4.41 14.72

6. Number of faults per 100 circuit kilometres of underground prescribed voltage electric line

6.6kV 11kV 22kV 33kV 110kV Total
2007 6.88 8.53 8.64 5.43 4.62 8.16
2006 7.23 7.18 1.45 5.20 - 6.73
2005 - 4.04 4.07 1.06 - 3.66
2004 - 6.46 4.09 5.59 7.72 6.28

7. Number of faults per 100 circuit kilometres of overhead prescribed voltage electric line

6.6kV 11kV 22kV 33kV 110kV Total
2007 20.33 24.95 57.41 16.51 7.77 24.14
2006 15.43 24.10 13.44 19.48 3.89 23.53
2005 - 21.37 - 20.10 19.43 21.12
2004 - 23.18 - 23.54 11.66 23.01

LexisNexis

5(c) 5(d) Vector plans to phase out 6.6kV by 2012



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2008, No 39


Gazette.govt.nz PDF NZ Gazette 2008, No 39





✨ LLM interpretation of page content

🏭 Electricity Reliability Performance Measures for Vector Limited (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Reliability, Faults, Performance measures, Vector Limited