β¨ Electricity Reliability Statistics
Requirement 21 (3)
1 Total number of interruptions, together with a breakdown of that total according to interruption class.
| Interruption Class | Number of Interruptions |
|---|---|
| 2007 | |
| MainPower | |
| Planned Shut-Down (Class B) | 217 |
| Unplanned Interruption (Class C) | 200 |
| Trans Power | |
| Planned Shut-Down (Class A) | 5 |
| Unplanned Interruption (Class D) | 5 |
| Generation | |
| Unplanned Interruption (Class E) | - |
| Generation Other | |
| Unplanned Interruption (Class F) | - |
| Other | |
| Other Interruptions (Class G) | - |
| Unplanned Interruption (Class G) | - |
| Total Unplanned Interruptions | 427 |
2 The total number of faults per 100 circuit kilometres of prescribed voltage electric line.
| Nominal Voltage | Faults per 100 km Total |
|---|---|
| 2007 | |
| 33 kV | 1.94 |
| 11 kV | 5.86 |
| TOTAL | 5.56 |
3 The total number of faults per 100 circuit kilometres of Underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| Nominal Voltage | Faults per 100 km Underground |
|---|---|
| 2007 | |
| 33 kV | - |
| 11 kV | 3.18 |
| TOTAL | 3.13 |
4 The total number of faults per 100 circuit kilometres of Overhead prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
| Nominal Voltage | Faults per 100 km Overhead |
|---|---|
| 2007 | |
| 33 kV | 1.96 |
| 11 kV | 6.04 |
| TOTAL | 5.68 |
5 The SAIDI for the total of interruptions *:
| 2007 | |
|---|---|
| 236.535 | |
| 2006 | |
| --------------------------- | -------- |
| 109.175 | |
| 2005 | |
| --------------------------- | -------- |
| 115.568 | |
| 2004 | |
| --------------------------- | -------- |
| 99.64 |
6 The SAIDI for the total number of interruptions within each interruption class:
| Network or Generation Owner | Classification | Minutes per Connected Customer |
|---|---|---|
| 2007 | ||
| MainPower | Planned Shut-Down (Class B) | 31.661 |
| Unplanned Interruption (Class C) | 185.454 | |
| Trans Power | Planned Shut-Down (Class A) | 0.164 |
| Unplanned Interruption (Class D) | 19.255 | |
| Generation | Unplanned Interruption (Class E) | - |
| Generation Other | Unplanned Interruption (Class F) | - |
| Other | Other Interruptions (Class G) | - |
| Unplanned Interruption (Class G) | - |
7 The SAIFI for the total number of interruptions *:
| 2007 |
|---|
| 2.273 |
| 2006 |
|---|
| 1.845 |
| 2005 |
|---|
| 1.165 |
| 2004 |
|---|
| 1.21 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2008, No 38
Gazette.govt.nz —
NZ Gazette 2008, No 38
β¨ LLM interpretation of page content
π
Disclosure of Reliability Performance Measures for MainPower New Zealand Limited
(continued from previous page)
π Trade, Customs & IndustryElectricity, Reliability, Interruptions, Performance Measures, MainPower New Zealand Limited, SAIDI, SAIFI, CAIDI