β¨ Electricity Statistics and Performance Measures
Statistics
| Name of retailer/
generator | 2007 | 2006 | 2005 | 2004 |
| --- | --- | --- | --- | --- |
| (g) Total amount of electricity (in kilowatt hours) supplied from the system, (after losses of electricity) on behalf of each person that is an electricity generator or electricity retailer or both: | | | | |
| Retailer A | 267,093,684 | 277,942,659 | 302,550,268 | 299,662,441 |
| Retailer B | 20,903,277 | 21,218,845 | 19,273,156 | 14,319,594 |
| Retailer C | 78,041,392 | 62,614,078 | 41,287,792 | 30,712,143 |
| Retailer D | 29,524,190 | 22,273,868 | 14,873,867 | 17,629,477 |
| Retailer E | 18,855,425 | 17,129,545 | 16,682,472 | 12,892,876 |
| Retailer F | 1,222,148 | 1,225,148 | 1,386,660 | 1,440,000 |
| Retailer G | 10,410,999 | 9,760,493 | 10,413,204 | 8,158,740 |
| Retailer H | 30,823,834 | 32,320,647 | 33,828,632 | 33,156,729 |
| Retailer I | 125,675 | 0 | 0 | 0 |
| Other | | | | |
| in kWh TOTAL | 457,000,624 | 444,485,283 | 440,296,051 | 417,972,000 |
| (h) Total number of consumers | Number | 35,545 | 34,813 | 33,931 | 32,781 |
DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES PURSUANT TO REQUIREMENT 21 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004 SCHEDULE 1 PART 5
| Interruptions | Average Interruption Targets | Interruption Targets | Actual Interruptions |
|---|---|---|---|
| Class | 2008/12 | 2008 | |
| 1 to 3 | |||
| Planned Interruptions | Class A | ||
| Class B | 45 | 45 | |
| Unplanned Interruptions | Class C | 100 | 100 |
| Class D | |||
| Class E | |||
| Class F | |||
| Class G | |||
| Class H | |||
| Class I | |||
| Total | 331 |
4 Proportion of Total Class C Interruptions not restored: (=a/b*100/1)
where -
a = No. of interruptions not restored within
| Within 3 Hours | Within 24 Hours | |
|---|---|---|
| 26 | 0 |
b = Total number of Class C interruptions
| | 171 | 171 |
Proportion expressed as a percentage
| | 15.20% | 0.00% |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2008, No 37
Gazette.govt.nz —
NZ Gazette 2008, No 37
β¨ LLM interpretation of page content
ποΈ
Statistics of Electricity System Length and Capacity
(continued from previous page)
ποΈ Infrastructure & Public WorksElectricity, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Total Electricity
ποΈ Disclosure of Reliability Performance Measures
ποΈ Infrastructure & Public WorksElectricity, Interruptions, Performance Measures, Reliability, Class A, Class B, Class C