Electricity Reliability Statistics




19 FEBRUARY 2008 NEW ZEALAND GAZETTE, No. 30 669

Average SAIDI targets (next 5 years)

2008/12 2007/11 2006/10 2005/09
Class B – Planned 16 16 16 20
Class C – Unplanned 62 62 62 80
Total 78 78 78 100

SAIFI

2007 2006 2005 2004
Class A – Planned by Transpower - - - -
Class B – Planned by Electra 0.11 0.10 0.09 0.07
Class C – Unplanned by Electra 1.32 1.23 1.47 2.65
Class D – Unplanned by Transpower 1.75 1.54 0.39 0.78
Class E – Unplanned by embedded generation - - - -
Class F – Unplanned by generation on other network - - - -
Class G – Unplanned by other line owner - - - -
Class H – Planned by other line owner - - - -
Class I – Any other loss of supply - - - -
Total 3.18 2.87 1.95 3.50

SAIFI targets (next year)

2008 2007 2006 2005
Class B – Planned 0.16 0.16 0.16 0.2
Class C – Unplanned 1.42 1.42 1.42 1.8
Total 1.58 1.58 1.58 2.0

Average SAIFI targets (next 5 years)

2008/12 2007/11 2006/10 2005/09
Class B – Planned 0.16 0.16 0.16 0.18
Class C – Unplanned 1.42 1.42 1.42 1.80
Total 1.58 1.58 1.58 1.98

CAIDI

2007 2006 2005 2004
Class A – Planned by Transpower - - - -
Class B – Planned by Electra 172.85 175.60 169.22 143.17
Class C – Unplanned by Electra 52.56 41.81 42.84 40.75
Class D – Unplanned by Transpower 55.84 16.23 14.51 20.0
Class E – Unplanned by embedded generation - - - -
Class F – Unplanned by generation on other network - - - -
Class G – Unplanned by other line owner - - - -
Class H – Planned by other line owner - - - -
Class I – Any other loss of supply - - - -
Total 58.33 32.75 43.01 38.13

LexisNexis



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2008, No 30


Gazette.govt.nz PDF NZ Gazette 2008, No 30





✨ LLM interpretation of page content

🏭 Reliability Performance Measure Targets (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Reliability, Interruptions, Targets, Performance Measures, Faults, SAIDI, SAIFI, CAIDI