Schedule 1 Part 4 Energy Delivery Efficiency Performance Measures and Statistics
2007
2006
2005
2004
2003
1 a) Load factor
54.5%
53.3%
61.1%
57.6%
54.0%
b) Loss ratio
5.4%
5.5%
4.9%
4.9%
4.9%
c) Capacity utilization
39.1%
39.1%
36.6%
37.6%
42.3%
2 a) Circuit km (total)
2007
2006
2005
2004
2003
33 kV
309.29
325.73
277.27
280.37
278.08
11 kV
2,574.66
2,544.82
2,547.28
2,564.77
2,591.37
400 V
2,111.86
2,100.42
2,059.44
2,030.17
1,872.93
TOTAL
4,995.81
4,970.96
4,884.00
4,875.31
4,742.38
b) Circuit km (overhead)
2007
2006
2005
2004
2003
33 kV
187.04
188.70
186.98
192.26
194.85
11 kV
2,049.76
2,049.53
2,061.86
2,087.41
2,127.37
400 V
1,151.80
1,165.33
1,166.02
1,167.64
1,044.04
TOTAL
3,388.59
3,403.56
3,414.86
3,447.31
3,366.26
c) Circuit km (underground)
2007
2006
2005
2004
2003
33 kV
122.26
137.02
90.30
88.11
83.23
11 kV
524.90
495.29
485.42
477.36
464.00
400 V
960.06
935.09
893.42
862.53
828.89
TOTAL
1,607.22
1,567.40
1,469.14
1,428.00
1,376.12
d) Transformer capacity (kVA)
2007
2006
2005
2004
2003
590,710
570,385
546,510
538,475
502,730
e) Maximum demand (kW)
2007
2006
2005
2004
2003
231,000
223,000
199,997
202,344
212,861
f) Total electricity entering the system (before losses of electricity) in kWh
2007
2006
2005
2004
2003
1,166,230,000
1,101,970,000
1,070,454,387
1,021,426,991
####
g) Total Electricity (kWh) supplied from the system (after losses of electricity) during the financial year or on behalf of each person that is an electricity generator or retailer or both