β¨ Electricity Information Disclosure
4910 NEW ZEALAND GAZETTE, No. 186 28 NOVEMBER 2008
1 The Electricity Information Disclosure Requirements
(For 12 months ending 30 June 2008, 2007, 2006, 2005)
Part 4
Energy Delivery Efficiency Performance Measures and Statistics
(Disclosure under Requirement 20)
1. Energy delivery efficiency performance measures
(a) Load factor (%)
Electrical energy entering the transmission system as percentage of maximum demand times hours per year
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 68.35 | 66.60 | 66.50 | 69.70 |
(b) Loss ratio (%)
Transmission losses as percentage of energy entering the system
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 3.66 | 3.74 | 3.63 | 3.76 |
(c) Capacity utilisation (%)
Maximum demand as percentage of total transformer capacity
Based on Maximum Continuous Ratings
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 48.10 | 50.37 | 51.61 | 49.72 |
2. Statistics
(a) System length, broken down by voltage (km)
| Total a | 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|---|
| Total a | 17,333 | 17,334 | 17,248 | 17,045 | |
| 350 kV (HVDC) | 611 | 611 | 611 | 611 | |
| 270 kV (HVDC) | 611 | 611 | 611 | 611 | |
| 0 kV (HVDC earth electrode) | 31 | 31 | 31 | 31 | |
| 220 kV (HVAC) | 8,631 | 8,617 | 8,611 | 8,380 | |
| 110 kV (HVAC) | 6,298 | 6,299 | 6,219 | 6,073 | |
| 66/50/33/11 kV (HVAC) a | 1,151 | 1,165 | 1,165 | 1,339 |
(b) Circuit length of overhead electric lines, broken down by voltage (km).
| Total a | 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|---|
| Total a | 17,248 | 17,249 | 17,163 | 16,960 | |
| 350 kV (HVDC) | 571 | 571 | 571 | 571 | |
| 270 kV (HVDC) | 571 | 571 | 571 | 571 | |
| 0 kV (HVDC earth electrode) | 31 | 31 | 31 | 31 | |
| 220 kV (HVAC) | 8,631 | 8,617 | 8,611 | 8,380 | |
| 110 kV (HVAC) | 6,293 | 6,294 | 6,214 | 6,068 | |
| 66/50/33/11 kV (HVAC) a | 1,151 | 1,165 | 1,165 | 1,339 |
NB: HVDC link submarine power cables measure approximately 80km. Broken down by voltage
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 350 kV (HVDC) | 40 | 40 | 40 | 40 |
| 270 kV (HVDC) | 40 | 40 | 40 | 40 |
(c) Total circuit length of underground electric lines (km)
( 110 kV HVAC)
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 5 | 5 | 5 | 5 |
(d) Transformer capacity (Maximum Continuous Ratings) (kVA)
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 13.80x10^6 | 13.31x10^6 | 12.88x10^6 | 12.75x10^6 |
(e) Maximum demand (kilowatts) bc (kW)
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 6.64x10^6 | 6.71x10^6 | 6.65x10^6 | 6.34x10^6 |
(f) Total electricity entering the system (before losses) bc (kWh)
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 39.72x10^9 | 39.13x10^9 | 38.73x10^9 | 38.71x10^9 |
(g) Total amount of electricity (in kilowatt hours) supplied from the system (after losses of electricity) during the financial year on behalf of each person that is an electricity generator or an electricity retailer, or both: bcd (kWh)
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 38.27x10^9 | 37.66x10^9 | 37.33x10^9 | 37.25x10^9 |
(h) Total connected customers
| 2007/08 | 2006/07 | 2005/06 | 2004/05 | |
|---|---|---|---|---|
| 49 | 48 | 47 | 48 |
Notes
a Excludes 61km of circuits leased from others and operated by Transpower, and 34 km owned by Transpower but operated by others.
b To 2 decimal places only, higher accuracy used in calculations.
c For all years, figures for maximum demand kW and kWh injected and supplied include loads on circuits leased by Transpower. The effect of these circuits cannot be measured as metering equipment is not installed at the inter-connection points with Transpower-owned assets, but the difference is estimated to be no more than 0.1% of totals. Loads on Transpower assets leased to others are not included as Transpower does not collect operational data for these assets.
d Including sales to direct connected customers
Next Page →
β¨ LLM interpretation of page content
π Electricity Information Disclosure Requirements for 2008, 2007, 2006, 2005
π Trade, Customs & IndustryElectricity, Information Disclosure, Energy Delivery Efficiency, Statistics, Transmission System
NZ Gazette 2008, No 186