β¨ Electricity Reliability Statistics
2730 NEW ZEALAND GAZETTE, No. 101 23 JUNE 2008
8, 11,
12, 15,
16, 19 SAIDI, SAIFI and CAIDI by interruption class and in total (including the June 2006 snowstorm)
for 2007:
| Network or generation owner | Interruption class | Classification of interruptions | SAIDI (minutes per connected consumer) | SAIFI (interruptions per connected consumer) | CAIDI (minutes per consumer interrupted) |
|---|---|---|---|---|---|
| Orion | B | Planned shutdowns | 8.8 | 0.03 | 278 |
| C | Unplanned cuts | 141.3 | 0.65 | 219 | |
| Total | 150.1 | 0.68 | 222 | ||
| Transpower | A | Planned shutdowns | 0.2 | 0.00 | 282 |
| D | Unplanned cuts | 4.2 | 0.04 | 101 | |
| Total | 4.4 | 0.04 | 103 | ||
| Combined total | 154.5 | 0.72 | 215 |
8, 11,
12, 15,
16, 19 SAIDI, SAIFI and CAIDI by interruption class and in total for 2006:
| Network or generation owner | Interruption class | Classification of interruptions | SAIDI (minutes per connected consumer) | SAIFI (interruptions per connected consumer) | CAIDI (minutes per consumer interrupted) |
|---|---|---|---|---|---|
| Orion | B | Planned shutdowns | 6.0 | 0.02 | 238 |
| C | Unplanned cuts | 53.3 | 0.72 | 75 | |
| Total | 59.3 | 0.74 | 80 | ||
| Transpower | A | Planned shutdowns | 0.0 | 0.00 | 0 |
| D | Unplanned cuts | 4.7 | 0.22 | 21 | |
| Total | 4.7 | 0.22 | 21 | ||
| Combined total | 64.0 | 0.96 | 67 |
Next Page →
β¨ LLM interpretation of page content
π
Formulae for the Derivation of Financial Performance Measures
(continued from previous page)
π Trade, Customs & IndustryFinancial Performance, ROI, ROE, ROF, Electricity, Financial Statements
ποΈ Electricity Interruption Statistics for 2007
ποΈ Infrastructure & Public WorksElectricity, Reliability, Interruptions, SAIDI, SAIFI, CAIDI, Orion, Transpower
ποΈ Electricity Interruption Statistics for 2006
ποΈ Infrastructure & Public WorksElectricity, Reliability, Interruptions, SAIDI, SAIFI, CAIDI, Orion, Transpower
NZ Gazette 2008, No 101