DISCLOSURE OF ENERGY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS PURSUANT TO SCHEDULE 1, PART 4 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004
Energy Delivery Efficiency Performance Measures
2006
2005
2004
2003
2002
(a) Load Factor
76.20%
76.37%
77.87%
77.38%
74.85%
(b) Loss Ratio
3.12%
3.22%
3.54%
3.13%
4.50%
Loss Ratio Estimated
*3.60%
*3.60%
*3.70%
*3.70%
*3.60%
(c) Capacity Utilisation
33.19%
32.23%
31.82%
32.35%
32.70%
Estimated, based on distribution system configuration
Statistics
(a) System length, broken down by voltage:
Voltage
2006
2005
2004
2003
2002
- 33 kV
231.0 km
235.0 km
235.0 km
230.4 km
229.6 km
- 11 kV
3298.0 km
3,244.0 km
3,197.0 km
3,194.1 km
3,137.0 km
- 400V
2057.0 km
1,940.0 km
1,873.0 km
2,008.0 km
1,970.0 km
- Total
5586.0 km
5,419.0 km
5,305.0 km
5,430.5 km
5,336.6 km
(b) Circuit length of overhead lines, broken down by voltage:
Voltage
2006
2005
2004
2003
2002
- 33 kV
216.0 km
219.0 km
219.0 km
213.0 km
213.0 km
- 11 kV
3149.0 km
3,125.0 km
3,093.0 km
3,097.0 km
3,050.0 km
- 400V
1582.0 km
1,562.0 km
1,557.0 km
1,733.0 km
1,716.0 km
- Total
4946.0 km
4,906.0 km
4,869.0 km
5,043.0 km
4,979.0 km
(c) Circuit length of underground cables broken down by voltage:
Voltage
2006
2005
2004
2003
2002
- 33 kV
16.0 km
16.0 km
16.0 km
17.4 km
16.6 km
- 11 kV
149.0 km
119.0 km
104.0 km
97.1 km
87.0 km
- 400V
475.0 km
378.0 km
316.0 km
273.0 km
254.0 km
- Total
640.0 km
513.0 km
436.0 km
387.5 km
357.6 km
(d) Transformer capacity
Year
2006
2005
2004
2003
2002
kVA
433235 kVA
419,982 kVA
414,440 kVA
406,685 kVA
397,445 kVA
(e) Maximum demand
Year
2006
2005
2004
2003
2002
kW
143,800 kW
135,344 kW
131,880 kW
131,560 kW
129,978 kW
(f) Total electricity entering the system - kWh
Year
2006
2005
2004
2003
2002
kWh
959,899,374
905,439,718
899,598,208
891,815,703
852,225,151
(g) Total electricity supplied from the system for other retailers
ποΈ
Energy Delivery Efficiency Performance Measures and Statistics
ποΈInfrastructure & Public Works Energy efficiency, Load factor, Loss ratio, Capacity utilisation, System length, Circuit length, Transformer capacity, Maximum demand, Electricity supply, Retailers