β¨ Powerco Gas Division Performance Measures
3488 NEW ZEALAND GAZETTE, No. 133 30 NOVEMBER 2007
**POWERCO**
GAS DIVISION
13 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 17 AND PART III OF THE FIRST SCHEDULE OF THE GAS (INFORMATION DISCLOSURE) REGULATIONS 1997
13.1 Energy delivery efficiency measures
(a) Load Factor 73.65% 83.32% 86.34% 68.96%
(b) Un-accounted for Gas Ratio 2.50% 2.50% 2.50% 2.50%
13.2 Statistics
(a) System Length 5,792 km 5,609 km 5,415 km 5383 km
(b) Maximum monthly amount entering the system 1,082,107 1,055,459 1,242,515 1,188,378
(c) Total amount of gas conveyed 9,564,363 10,553,384 9,891,000 9,836,591
(d) Total amount of gas conveyed on behalf of other persons 9,564,363 10,553,384 9,891,000 9,836,591
(e) Total customers 103,404 103,988 104,203 107,300
14 DISCLOSURE OF PERFORMANCE MEASURES PURSUANT TO REGULATION 18 AND PART IV OF THE FIRST SCHEDULE OF THE GAS (INFORMATION DISCLOSURE) REGULATIONS 1997
14.1 Un-planned interruptions in transmission systems 0 0 0 0
14.2 Un-planned interruptions in distribution systems
(a) Un-planned Interruptions other than those directly resulting from un-planned interruptions of a transmission system 0.0146* 0.0036 0.0043 0.0022
(b) Un-planned interruptions directly resulting from un-planned interruptions of a transmission system 0 0 0 0.143
NOTE * This figure includes the Wellington CBD water inundation outage of August/September 2006. Without that significant event the reported figure would have been 0.0034
PUBLISHED BY THE DEPARTMENT OF INTERNAL AFFAIRS ISSN 0111-5650
LEXISNEXIS BY WICKLIFFE LIMITED ISSN 1177-8415
Price $5.00 (inc. GST)
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2007, No 133
Gazette.govt.nz —
NZ Gazette 2007, No 133
β¨ LLM interpretation of page content
π°
Powerco Gas Division Performance Measures
(continued from previous page)
π° Finance & RevenuePerformance Measures, Energy Delivery Efficiency, Load Factor, Un-accounted for Gas, System Length, Gas Conveyance, Customers, Un-planned Interruptions