✨ Financial Performance Measures




4618

NEW ZEALAND GAZETTE, No. 158

29 NOVEMBER 2006

Efficiency Performance Measures (Schedule 1, Part 3)

2006 2005 2004 2003
Direct line costs per kilometre 647 675 744 646
Direct expenditure 2,372,204 2,477,409 2,698,951 2,428,814
System length 3,666.64 3,671.80 3,629.30 3,758.25
2006 2005 2004 2003
Indirect line costs per consumer 77 70 61 67
Indirect expenditure 1,922,798 1,733,061 1,507,781 1,695,627
Total consumers 24,864 24,856 24,876 25,264

Energy Delivery Efficiency Performance Measures (Schedule 1, Part 4)

2006 2005 2004 2003
Load Factor (= [a/bc]*100/1) 61.75% 62.78% 82.68% 61.11%
where -
a = Kwh of electricity entering system during the financial year 302,358,736 306,333,406 296,456,944 296,908,821
b = Maximum Demand 55,894 55,699 53,847 55,463
c = Total number of hours in financial year 8760 8760 8784 8,760
2006 2005 2004 2003
Loss Ratio (= a/b*100/1) 6.35% 6.23% 7.58% 7.31%
where -
a = losses in electricity in kWh (this figure should be the difference between (f) and (g) from Statistics) 19,196,656 19,075,488 22,467,161 21,712,954
b = Kwh of electricity entering system during the financial year 302,358,736 306,333,406 296,456,944 296,908,821
2006 2005 2004 2003
Capacity Utilisation (= a/b*100/1) 27.87% 28.17% 26.23% 29.50%
where -
a = Maximum Demand 55,894 55,699 53,847 55,463
b = Transformer Capacity 200,520 197,711 190,763 188,006


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2006, No 158


Gazette.govt.nz PDF NZ Gazette 2006, No 158





✨ LLM interpretation of page content

🏭 Efficiency Performance Measures for Eastland Network Limited (continued from previous page)

🏭 Trade, Customs & Industry
Direct line costs, Direct expenditure, System length, Indirect line costs, Indirect expenditure, Total consumers

🏭 Energy Delivery Efficiency Performance Measures for Eastland Network Limited (continued from previous page)

🏭 Trade, Customs & Industry
Load Factor, Loss Ratio, Capacity Utilisation, Electricity delivery, Efficiency