β¨ Electricity Reliability Statistics
Vector Limited
Electricity Lines Business
Reliability Performance Measures to be Disclosed by Disclosing Entities (Other Than Transpower) (continued)
For the year ended 31 March 2006
SCHEDULE 1 β PART 5 (continued)
- Faults per 100 circuit kilometres of prescribed voltage electric line
| 2006 | 2005 | 2004 | 2003 | |
|---|---|---|---|---|
| (a) The total number of faults(^5) | 15.22 | 12.56 | 14.91 | 12.55 |
| 2007 | |
|---|---|
| (b) The total number of targeted faults | 13.27 |
| 2007-2011 | |
|---|---|
| (c) The average total number of faults | 10.81 |
(d) Breakdown of (a) to (c) according to line voltage
| 6.6kV | 11kV | 22kV | 33kV | 110kV | Total | |
|---|---|---|---|---|---|---|
| (a) 2006 | 10.38 | 15.96 | 2.07 | 11.99 | 1.10 | 15.22 |
| (b) 2007 | 5.70 | 14.42 | 3.64 | 7.64 | 0.98 | 13.27 |
| (c) 2007-2011 | - | 12.23 | 3.18 | 6.62 | 0.98 | 10.81 |
- Number of faults per 100 circuit kilometres of underground prescribed voltage electric line(^5)
| 6.6kV | 11kV | 22kV | 33kV | 110kV | Total | |
|---|---|---|---|---|---|---|
| 2006 | 7.23 | 7.18 | 1.45 | 5.20 | - | 6.73 |
| 2005 | - | 4.04 | 4.07 | 1.06 | - | 3.66 |
| 2004 | - | 6.46 | 4.09 | 5.59 | 7.72 | 6.28 |
| 2003 | - | 6.46 | 5.67 | 0.57 | 1.54 | 5.68 |
- Number of faults per 100 circuit kilometres of overhead prescribed voltage electric line(^5)
| 6.6kV | 11kV | 22kV | 33kV | 110kV | Total | |
|---|---|---|---|---|---|---|
| 2006 | 15.43 | 24.10 | 13.44 | 19.48 | 3.89 | 23.53 |
| 2005 | - | 21.37 | - | 20.10 | 19.43 | 21.12 |
| 2004 | - | 23.18 | - | 23.54 | 11.66 | 23.01 |
| 2003 | 15.13 | 20.22 | - | 8.57 | 7.78 | 19.12 |
(^2) The 2003 performance statistics have been calculated using a time-weighted average in accordance with the Electricity (Information Disclosure) Regulations 2000, Regulation 33. Vector Limited was combined with UnitedNetworks Limited in October 2002. One month (October 2002) includes the Eastern region of UnitedNetworks Limited as well as the Northern and Wellington regions. The final 5 months are for Vector Limited, plus the Northern and Wellington regions of UnitedNetworks Limited.
(^5) Figures calculated using tables 2(a.2, b.2, c.2)
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2006, No 155
Gazette.govt.nz —
NZ Gazette 2006, No 155
β¨ LLM interpretation of page content
π
Vector Limited Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryVector Limited, Electricity Lines Business, Reliability Performance, Faults, Circuit Kilometres, Prescribed Voltage, Underground Lines, Overhead Lines, Statistics