β¨ Energy Distribution Performance Report
HORIZON ENERGY DISTRIBUTION LIMITED
Requirement 21 Reliability Performance Measures
For the year ended 31 March 2006
| 2006 | 2005 | 2004 | 2003 |
|---|
- Interruptions
Class A - Transpower planned interruptions | 1 | 8 | 1 | 2 |
Class B - Horizon planned interruptions | 68 | 51 | 67 | 57 |
Class C - Horizon unplanned interruptions | 110 | 125 | 83 | 80 |
Class D - Transpower unplanned interruptions | 8 | 5 | 4 | 4 |
Class E - Horizon generation unplanned interruptions | - | - | - | - |
Class F - Other generation unplanned interruptions | 2 | - | - | - |
Class G - Other line owner unplanned interruptions | - | 1 | - | - |
Class H - Other line owner planned interruptions | - | - | - | - |
Class I - Not in A to H | 2 | 2 | - | - |
Total Number of Interruptions | 187 | 192 | 155 | 143 |
| 2007 | 2006 | 2005 | 2004 | 2003 |
|---|
-
Interruption Targets (Next Year)
(a) Planned interruptions (Class B) | 62 | 62 | 62 | 80 | 80 |
(b) Unplanned interruptions (Class C) | 82 | 82 | 82 | 85 | 75 | -
Average Interruption Targets (Next 5 Years)
(a) Planned interruptions (Class B) | 62 | 62 | 62 | 80 | 80 |
(b) Unplanned interruptions (Class C) | 82 | 82 | 82 | 85 | 75 | -
Proportion of Class C interruptions not restored within
(a) 3 hours | 25.00% | 33.60% | 14.46% | 15.00% |
(b) 24 hours | 0.89% | 8.80% | 0.00% | 0.00% | -
Faults per 100 km of prescribed voltage line
| | 2006 | 2005 | 2004 | 2003 |
| --- | --- | --- | --- | --- |
(a) Number of faults
110 kV | - | - | - | - |
33 kV | 4.0 | 3.9 | 0.6 | 0.6 |
11 kV | 9.0 | 7.0 | 4.9 | 4.7 |
Total Number of Faults | 8.5 | 6.7 | 4.6 | 4.3 |
| 2007 | 2006 | 2005 | 2004 | 2003 |
|---|
(b) Number of Faults Targeted
110 kV | - | - | - | - | 1.1 |
33 kV | 4.9 | 4.9 | 4.9 | 5.1 | 4.4 |
11 kV | - | - | - | - | - |
Total Number of Faults Targeted | 4.4 | 4.5 | 4.5 | 4.6 | 4.1 |
(c) Average Number of Faults Targeted (Next 5yrs)
110 kV | - | - | - | - | -
33 kV | 4.9 | 4.9 | 4.9 | 5.1 | 4.4 |
11 kV | - | - | - | - | -
Total Average Number of Faults Targeted | 4.4 | 4.5 | 4.5 | 4.6 | 4.1 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2006, No 151
Gazette.govt.nz —
NZ Gazette 2006, No 151
β¨ LLM interpretation of page content
π
Horizon Energy Distribution Limited Performance Report
(continued from previous page)
π Trade, Customs & IndustryEnergy Reliability, Interruptions, Faults, Performance Measures, Targets