Maximum Demand $5.43 per KVA (Previously, $5.00 per KVA) - APPLY FROM 1/5/2006

Monitored 0700-2300 daily and charged at the average of the 3 highest demands per calendar month, with a maximum of one demand per day.

Meter Charge (APPLY FROM 1/10/99)

A monthly charge depending on the metering equipment installed.

  • Standard two channel meter $56.00 per month
  • Standard two channel meter with cell site $98.00 per month

Connection Charge (APPLY FROM 1/5/2006)

A monthly charge depending on capacity available:

EXISTING AND NEW TOU CONNECTIONS
Capacity
----------
50 kVA
100 kVA
150 kVA
200 kVA
300 kVA
400 kVA
500 kVA
750 kVA
1000 kVA
FT CHG

SPECIAL ICP CONNECTIONS*

| Misc. 1 | 0.00 | 0.00 | 0.00 | 0.00 |
| Misc. 2
| 31.62 | 31.00 | 34.31 | 33.69 |
| Misc. 3 | 695.64 | 685.00 | 754.77 | 744.13 |
| Misc. 4
| 748.34 | 737.00 | 811.95 | 800.65 |
| Misc. 5* | 948.60 | 934.00 | 1029.23 | 1014.63 |

*Number of Customers: 123



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2006, No 150


Gazette.govt.nz PDF NZ Gazette 2006, No 150





✨ LLM interpretation of page content

🏭 TOU Schedule V - Standard Time of Use (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Tariffs, Pricing, Discounts, TOU Schedule