β¨ Electricity Pricing and Charges
4372 NEW ZEALAND GAZETTE, No. 150 27 NOVEMBER 2006
Maximum Demand $5.43 per KVA (Previously, $5.00 per KVA) - APPLY FROM 1/5/2006
Monitored 0700-2300 daily and charged at the average of the 3 highest demands per calendar month, with a maximum of one demand per day.
Meter Charge (APPLY FROM 1/10/99)
A monthly charge depending on the metering equipment installed.
- Standard two channel meter $56.00 per month
- Standard two channel meter with cell site $98.00 per month
Connection Charge (APPLY FROM 1/5/2006)
A monthly charge depending on capacity available:
| EXISTING AND NEW TOU CONNECTIONS |
|---|
| Capacity |
| ---------- |
| 50 kVA |
| 100 kVA |
| 150 kVA |
| 200 kVA |
| 300 kVA |
| 400 kVA |
| 500 kVA |
| 750 kVA |
| 1000 kVA |
| FT CHG |
SPECIAL ICP CONNECTIONS*
| Misc. 1 | 0.00 | 0.00 | 0.00 | 0.00 |
| Misc. 2 | 31.62 | 31.00 | 34.31 | 33.69 |
| Misc. 3 | 695.64 | 685.00 | 754.77 | 744.13 |
| Misc. 4 | 748.34 | 737.00 | 811.95 | 800.65 |
| Misc. 5* | 948.60 | 934.00 | 1029.23 | 1014.63 |
*Number of Customers: 123
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2006, No 150
Gazette.govt.nz —
NZ Gazette 2006, No 150
β¨ LLM interpretation of page content
π
TOU Schedule V - Standard Time of Use
(continued from previous page)
π Trade, Customs & IndustryElectricity, Tariffs, Pricing, Discounts, TOU Schedule