✨ Westpower Limited Lines Business Statistics




WESTPOWER LIMITED - LINES BUSINESS

10 Average SAIDI target for 2006/2007 to 2009/2010 years

Class B - Planned - by Line Owners              40
Class C - Unplanned - by Line Owners            70

11 The SAIDI for the total number of interruptions within each interruption class

                         2006    2005    2004    2003   
Class A - Planned - by Transpower 0 3.07 5.47 0
Class B - Planned - by Line Owners 76.39 71.31 42.11 66.76
Class C - Unplanned - by Line Owners 69.49 188.54 145.64 55.26
Class D - Unplanned - by Transpower 5.24 109.14 12.27 0
Class E - Unplanned - by ECNZ 0 0 0 0
Class F - Unplanned - by other generation 0 0 0 0
Class G - Any other loss of supply 0 0 0 0
Total 151.12 372.06 205.49 122.02

12 The SAIFI for the total number of interruption

2.04    4.23    2.40    1.16

13 SAIFI target for 2006/2007

Class B - Planned - by Line Owners            0.25
Class C - Unplanned - by Line Owners          1

14 Average SAIFI target for 2006/2007 to 2009/2010 years

Class B - Planned - by Line Owners            0.25
Class C - Unplanned - by Line Owners          1

15 The SAIFI for the total number of interruptions within each interruption class

                         2006    2005    2004    2003   
Class A - Planned - by Transpower 0 0.01 0.02 0
Class B - Planned - by Line Owners 0.28 0.34 0.19 0.27
Class C - Unplanned - by Line Owners 1.10 2.89 2.02 0.89
Class D - Unplanned - by Transpower 0.66 0.99 0.17 0
Class E - Unplanned - by ECNZ 0 0 0 0
Class F - Unplanned - by other generation 0 0 0 0
Class G - Any other loss of supply 0 0 0 0
Total 2.04 4.23 2.40 1.16

16 The CAIDI for the total number of interruption

73.90    88.03    85.62    105

17 CAIDI targets for 2006/2007

Class B - Planned - by Line Owners            160
Class C - Unplanned - by Line Owners          70

18 Average CAIDI target for 2006/2007 to 2009/2010 years

Class B - Planned - by Line Owners            160
Class C - Unplanned - by Line Owners          70



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2006, No 145


Gazette.govt.nz PDF NZ Gazette 2006, No 145





✨ LLM interpretation of page content

πŸ’° Westpower Limited System Length Statistics (continued from previous page)

πŸ’° Finance & Revenue
System length, Circuit kilometres, Underground system length, Transformer capacity, Maximum demand, Electricity supply, Retailers, Consumers, Interruptions, Reliability performance