10 Average SAIDI targets (5 years)
Class B - Planned by Line Owner 93
Class C - Unplanned by Line Owner 57
11 SAIDI - Classification of interruptions
Class B - Planned by Line Owner 62.30 78.88 88.61 103.80
Class C - Unplanned by Line Owner 87.90 53.81 110.02 201.37
Class D - Unplanned by Transpower 0 0 0 13.69
Class G - Unplanned by Other Line Owner 0 0.01 0 0
12 SAIFI for the total number of interruptions 1.31 1.17 1.47 2.40
13 SAIFI targets (next year)
Class B - Planned by Line Owner 0.26
Class C - Unplanned by Line Owner 0.94
14 Average SAIFI targets (5 years)
Class B - Planned by Line Owner 0.26
Class C - Unplanned by Line Owner 0.94
15 SAIFI - Classification of interruptions
Class B - Planned by Line Owner 0.22 0.25 0.30 0.38
Class C - Unplanned by Line Owner 1.09 0.92 1.17 1.51
Class D - Unplanned by Transpower 0 0 0 0.52
Class G - Unplanned by Other Line Owner 0 0 0 0
16 CAIDI for the total number of interruptions 114 113 135 133
17 CAIDI targets for (next year)
Class B - Planned by Line Owner 358
Class C - Unplanned by Line Owner 61
18 Average CAIDI target (5 years)
Class B - Planned by Line Owner 358
Class C - Unplanned by Line Owner 61
19 CAIDI - Classification of Interruptions
Class B - Planned by Line Owner 278 313 295 275
Class C - Unplanned by Line Owner 81 59 94 134
Class D - Unplanned by Transpower 0 0 0 27
Class G - Unplanned by Other Line Owner 0 10 0 0
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2006, No 143
Gazette.govt.nz —
NZ Gazette 2006, No 143
β¨ LLM interpretation of page content
π
Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability, Fault Restoration Times, Class C, Faults per 100 km, Voltage Lines, SAIDI, SAIFI, CAIDI