✨ Reliability Performance Measures




4148

NEW ZEALAND GAZETTE, No. 143

20 NOVEMBER 2006

10 Average SAIDI targets (5 years)

Class B - Planned by Line Owner 93
Class C - Unplanned by Line Owner 57

11 SAIDI - Classification of interruptions

Class B - Planned by Line Owner 62.30 78.88 88.61 103.80
Class C - Unplanned by Line Owner 87.90 53.81 110.02 201.37
Class D - Unplanned by Transpower 0 0 0 13.69
Class G - Unplanned by Other Line Owner 0 0.01 0 0

12 SAIFI for the total number of interruptions 1.31 1.17 1.47 2.40

13 SAIFI targets (next year)

Class B - Planned by Line Owner 0.26
Class C - Unplanned by Line Owner 0.94

14 Average SAIFI targets (5 years)

Class B - Planned by Line Owner 0.26
Class C - Unplanned by Line Owner 0.94

15 SAIFI - Classification of interruptions

Class B - Planned by Line Owner 0.22 0.25 0.30 0.38
Class C - Unplanned by Line Owner 1.09 0.92 1.17 1.51
Class D - Unplanned by Transpower 0 0 0 0.52
Class G - Unplanned by Other Line Owner 0 0 0 0

16 CAIDI for the total number of interruptions 114 113 135 133

17 CAIDI targets for (next year)

Class B - Planned by Line Owner 358
Class C - Unplanned by Line Owner 61

18 Average CAIDI target (5 years)

Class B - Planned by Line Owner 358
Class C - Unplanned by Line Owner 61

19 CAIDI - Classification of Interruptions

Class B - Planned by Line Owner 278 313 295 275
Class C - Unplanned by Line Owner 81 59 94 134
Class D - Unplanned by Transpower 0 0 0 27
Class G - Unplanned by Other Line Owner 0 10 0 0



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2006, No 143


Gazette.govt.nz PDF NZ Gazette 2006, No 143





✨ LLM interpretation of page content

🏭 Reliability Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Reliability, Fault Restoration Times, Class C, Faults per 100 km, Voltage Lines, SAIDI, SAIFI, CAIDI