β¨ Energy Performance Statistics
TOP ENERGY LIMITED
Performance Measures and Statistics
For the Year Ended 31 March 2006
Regulation 22
Reliability Performance Measures
i. Total number of interruptions and breakdowns by interruption class
| Class Type of Interruption | Target 5Yr Ave. | Target 2007 | 2006 | 2005 | 2004 | 2003 |
|---|---|---|---|---|---|---|
| A Planned - Transpower | No | No | No | No | ||
| 1 | 0 | 0 | 0 | |||
| B Planned - Top Energy | 122 | 120 | 159 | 147 | 169 | 144 |
| C Unplanned - Top Energy | 178 | 190 | 368 | 220 | 219 | 249 |
| D Unplanned - Transpower | 0 | 2 | 1 | 0 | ||
| E Unplanned - Embedded Generation | 0 | 0 | 0 | 0 | ||
| F Unplanned - Other Generation | 0 | 0 | 0 | 0 | ||
| G Unplanned - Another Line owner | 0 | 0 | 0 | 0 | ||
| H Planned - Another Line owner | 0 | 0 | 0 | 0 | ||
| I Any other interruption | 0 | 0 | 0 | 0 | ||
| Total - All interruptions | 528 | 369 | 389 | 393 |
Class C Interruptions not restored:
a. Within 3 hours:
| % | % | % | % | |
|---|---|---|---|---|
| 46% | 46% | 42% | 30% |
b. Within 24 hours:
| % | % | % | % | |
|---|---|---|---|---|
| 2% | 0% | 1% | 0% |
ii. Number of faults per 100 circuit kms
| Line Voltage | Total | Underground | Overhead |
|---|---|---|---|
| 2006 2005 2004 | 2006 2005 2004 | 2006 2005 2004 | |
| 2003 | 2003 | 2003 | |
| ------------- | ---------------- | ---------------- | ---------------- |
| 66kV | |||
| 33kV | 3.70 2.22 4.78 | 0.00 0.00 0.00 | 3.70 2.22 4.81 |
| 7.74 | 0.00 | 7.74 | |
| 11kV | 12.90 8.71 7.28 | 0.00 0.00 0.00 | 13.50 8.71 7.59 |
| 7.21 | 7.38 | ||
| 6.6kV | |||
| 3.3kV | |||
| Total | 12.10 8.07 7.06 | 0.00 0.00 0.00 | 12.70 8.07 7.34 |
| 7.25 | 0.00 | 7.41 |
| Target Faults | Target 5Yr Ave. | Target 2007 |
|---|---|---|
| 33kV | 2.0 | 2.1 |
| 11kV | 7.0 | 7.5 |
| Total | 7.0 | 7.0 |
iii. Breakdown of statistics by interruption class
| Class Type of Interruption | SAIDI | SAIFI | CAIDI (Minutes) |
|---|---|---|---|
| 2006 (2005) | 2006 (2005) | 2006 (2005) | |
| 2004 2003 | 2004 2003 | 2004 2003 | |
| ----------------------------- | ----------------- | ---------------- | ----------------- |
| A Planned - Transpower | 34.0 0.0 0.0 0.0 | 0.1 0.0 0.0 | 229.0 0.0 0.0 |
| 0.0 | 0.0 | ||
| B Planned - Top Energy | 22.3 39.4 37.0 | 0.1 0.3 0.3 | 154.0 154.0 163.0 |
| 0.3 | 136.0 | ||
| C Unplanned - Top Energy | 499.8 343.1 311.9 | 5.4 4.3 4.2 | 92.0 80.0 94.0 |
| 382.9 | 6.1 | 63.0 | |
| D Unplanned - Transpower | 0.0 113.7 1.5 | 0.0 1.6 0.1 | 0.0 71.0 17.0 |
| 0.0 | 0.0 | ||
| E Unplanned - Embedded Gen | 0.0 0.0 0.0 0.0 | 0.0 0.0 0.0 | 0.0 0.0 0.0 |
| F Unplanned - Other Gen | 0.0 0.0 0.0 0.0 | 0.0 0.0 0.0 | 0.0 0.0 0.0 |
| G Unplanned - Another Line owner | 0.0 0.0 0.0 0.0 | 0.0 0.0 0.0 | 0.0 0.0 0.0 |
| H Planned - Another Line owner | 0.0 0.0 0.0 0.0 | 0.0 0.0 0.0 | 0.0 0.0 0.0 |
| I Any other interruption | 0.0 0.0 0.0 0.0 | 0.0 0.0 0.0 | 0.0 0.0 0.0 |
| Total - All interruptions | 556.1 496.2 | 5.6 6.2 | 96.0 81.0 |
| 352.9 414.9 | 4.6 6.4 | 77.0 66.0 |
| Targets: | Target 5Yr Ave. | Target 2007 |
|---|---|---|
| B Planned - Top Energy | 40 | 40 |
| C Unplanned - Top Energy | 260 | 280 |
| | SAIFI | CAIDI |
| | Target 5Yr Ave. | Target 2007 | Target 5Yr Ave. | Target 2007 |
|-----------------------------|-----------------|---------------|----------------|-------------|
| B Planned - Top Energy | 0.3 | 0.3 | 133 | 133 |
| C Unplanned - Top Energy | 4.9 | 4.9 | 53 | 57 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2006, No 142
Gazette.govt.nz —
NZ Gazette 2006, No 142
β¨ LLM interpretation of page content
π
Top Energy Limited Annual Valuation Reconciliation Report
(continued from previous page)
π Trade, Customs & IndustryValuation, Financial Report, Fixed Assets, Depreciation, Electricity, ODV