β¨ Energy Efficiency Performance Measures
8 NOVEMBER 2006
NEW ZEALAND GAZETTE, No. 131
3783
THE POWER COMPANY LIMITED LINE BUSINESS
ENERGY EFFICIENCY PERFORMANCE MEASURES
AND STATISTICS
PURSUANT TO REQUIREMENT 20 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004, SCHEDULE 1 PART 4
ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES YEARS ENDING 31 MARCH 2003, 2004, 2005 AND 2006
| 2006 | 2005 | 2004 | 2003 | |
|---|---|---|---|---|
| Load Factor (Percentage of electrical energy entering the transmission system over maximum demand times hours per year.) | 67.5% | 68.3% | 67.9% | 68.2% |
| Loss Ratio (Transmission losses over energy entering the system) | 7.8% | 8.3% | 8.4% | 9.1% |
| Capacity Utilisation (Maximum demand over total transformer capacity) | 34.0% | 33.7% | 34.5% | 35.9% |
The loss ratio is derived from electricity supplied information provided by other parties. The Power Company Limited is unable to audit this information and is not confident with its accuracy.
STATISTICS
| 66kV | 33kV | 11kV | 400V | Total | |
|---|---|---|---|---|---|
| System Length (km's) | |||||
| 2002/03 | 349 | 489 | 5,724 | 1,005 | 7,567 |
| 2003/04 | 357 | 476 | 6,654 | 985 | 8,472 |
| 2004/05 | 357 | 462 | 6,688 | 991 | 8,498 |
| 2005/06 | 357 | 463 | 6,701 | 1,019 | 8,540 |
| Overhead Lines (km's) | |||||
| 2002/03 | 349 | 486 | 5,669 | 876 | 7,379 |
| 2003/04 | 357 | 472 | 6,569 | 865 | 8,263 |
| 2004/05 | 357 | 459 | 6,598 | 864 | 8,278 |
| 2005/06 | 357 | 459 | 6,606 | 862 | 8,284 |
| Underground Cables (km's) | |||||
| 2002/03 | - | 3 | 55 | 129 | 187 |
| 2003/04 | - | 4 | 85 | 120 | 209 |
| 2004/05 | - | 3 | 90 | 127 | 220 |
| 2005/06 | - | 4 | 95 | 158 | 257 |
| TX Capacity | Maximum Demand | Electricity Supplied | Electricity Conveyed | Total Customers | |
|---|---|---|---|---|---|
| 2002/03 | 308,761 | 110,963 | 662,476,687 | 602,095,219 | 31,944 |
| 2003/04 | 320,740 | 110,520 | 657,269,620 | 601,929,800 | 31,875 |
| 2004/05 | 332,875 | 112,173 | 671,083,840 | 615,162,069 | 31,967 |
| 2005/06 | 335,489 | 114,010 | 673,940,046 | 621,158,633 | 32,243 |
| Retailer | kWh (2005/06) | kWh (2004/05) | kWh (2003/04) | kWh (2002/03) |
|---|---|---|---|---|
| Retailer A | - | - | - | - |
| Retailer B | 16,369,056 | 14,749,281 | 12,742,402 | 21,740,841 |
| Retailer C | 414,451,245 | 390,352,970 | 341,002,613 | 337,448,503 |
| Retailer D | 127,129,121 | 146,791,042 | 188,904,810 | 166,448,292 |
| Retailer E | 17,688,033 | 15,463,788 | 13,139,523 | 24,589,531 |
| Retailer F | 23,867,866 | 24,100,091 | 21,482,377 | 26,999,250 |
| Retailer G | 13,891 | - | - | - |
| Electricity Invercargill Limited | 21,639,421 | 23,704,897 | 24,658,075 | 24,868,802 |
| Total | 621,158,633 | 615,162,069 | 601,929,800 | 602,095,219 |
The Electricity Conveyed details are provided by other parties. The Power Company Limited is unable to audit this information and is not confident with its accuracy.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2006, No 131
Gazette.govt.nz —
NZ Gazette 2006, No 131
β¨ LLM interpretation of page content
π
Energy Efficiency Performance Measures and Statistics for The Power Company Limited
(continued from previous page)
π Trade, Customs & IndustryEnergy Efficiency, Transmission Losses, Load Factor, Capacity Utilisation, System Length, Overhead Lines, Underground Cables, Electricity Supplied, Electricity Conveyed, Retailers