Energy Performance Measures




Buller Electricity Limited

Line Business Performance Measures

2006 2005 2004 2003
CAIDI

16

The CAIDI for the total number of interruptions

| | 104 | 100 | 107 | 187 |

17

CAIDI targets for 2006/2007

  • Class B - Planned by Line Owners: 200
  • Class C - Unplanned by Line Owners: 88

18

Average CAIDI Target for 2007/2011 years

  • Class B - Planned by Line Owners: 173
  • Class C - Unplanned by Line Owners: 83

19

The CAIDI for the total number of interruptions within each interruption class

Class 2006 2005 2004 2003
Class A - Planned by Transpower 0 0 0 0
Class B - Planned by Buller Electricity 176 145 163 411
Class C - Unplanned by Buller Electricity 71 84 69 109
Class D - Unplanned by Transpower 42 0 0 0
Class E - Unplanned by Line Owner generation 0 0 0 0
Class F - Unplanned by other generator 0 0 0 0
Class G - Unplanned – by another Line Owner 0 0 0 30
Class H – Planned – by another Line Owner 0 0 45 0
Class I – Any Other Loss of Supply --- 40 --- ---

| Totals | 104 | 100 | 107 | 187 |

Note: The totals in clause 19 are not designed to sum the figures above each total.



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2006, No 128


Gazette.govt.nz PDF NZ Gazette 2006, No 128





✨ LLM interpretation of page content

🏭 Line Business Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Energy Delivery, Efficiency, Buller Electricity Limited, Statistics