Mining Qualifications and Public Trust Notice




730

NEW ZEALAND GAZETTE, No. 30

27 JANUARY 2005

Group 10 – Underground Metalliferous

Group 10

7142 Demonstrate knowledge of regulatory requirements to manage an extractive site 6 20

7143 Inspect and report on extractive site and operations 5 10

7144 Review and implement plans for ongoing operations of extractive site 5 15

7145 Design, establish and maintain effective ventilation systems in underground mines 5 10

7147 Assess and support roof and sides of an underground mine 4 10

7168 Determine and plan reclamation operations of an extractive site 6 15

7169 Design an effective ventilation system in an underground coal mine 6 15

8899 Plan storage for product processed at extractive sites 4 8

8902 Prepare and implement plans for quarry face and benching operations 4 4

8910 Manage surface extraction site to minimize environmental impact 5 7

8913 Plan and manage aggregate production to minimise environmental impact 5 15

15658 Select excavation and transportation plant for surface extraction 4 8

15661 Select processing plant for quarrying underground mines and tunnels 4 10

15662 Investigate and design a roof support system for underground mines and tunnels 6 20

15663 Design and maintain sloping surfaces in surface excavations and stockpiles 6 20

15665 Demonstrate knowledge of the geology of surface extraction 4 5

15666 Demonstrate knowledge of the geology of underground extraction 4 10

15667 Demonstrate knowledge of surface extraction methods. 5 10

15670 Demonstrate knowledge of extraction methods for metalliferous mines 6 20

15671 Demonstrate knowledge of theoretical mechanics and apply in laboratory conditions 5 12

12632 Test for gas in an underground extraction site 4 10

16686 Conduct an incident investigation at an extraction site 5 2

17693 Demonstrate knowledge of water properties in extractive sites 6 6

17744 Read and interpret an underground extractive site plan 4 5

17746 Show ability to manage old workings and other sources of danger in underground extraction sites 5 10

Group 11 – Winding Engines

Group 11

7164 Operate a manually controlled winding engine in an underground mine 4 6

OR

7238 Operate an automatically controlled winding engine in an underground mine 4 6

Group 12 – Gas testing

Group 12

12632 Test for gas in an underground extraction site 4 6

Group 13 – Managers (where explosives are used)

Group 13

8890 Store explosives for use in extractive industries 4 10

17694 Demonstrate knowledge of explosives and their properties 4 20

go394


Public Trust

Public Trust Act 2001

Notice of Claim

This notice is pursuant to section 101 (2) of the Public Trust Act 2001.

To all creditors and claimants of Printcom Holdings Limited (a company that was struck off on 21 June 2004):

The sum of $9,114.00 has been paid to Public Trust to hold in the name of the deregistered company.

A claim has been lodged by Adrienne Liocadia Bushell, a former director of Printcom Holdings Limited.

Public Trust proposes paying the amount of the claim, less associated costs, to the principal shareholder of Printcom



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 30


Gazette.govt.nz PDF NZ Gazette 2005, No 30





✨ LLM interpretation of page content

👷 Amendments to the experience and qualifications required by applicants for a Certificate of Competence under the HSE (Mining Administration) Regulations 1996 (continued from previous page)

👷 Labour & Employment
Certificates of Competence, Mining, Qualifications, Experience, Amendments

🏢 Notice of Claim under the Public Trust Act 2001

🏢 State Enterprises & Insurance
Public Trust, Claim, Printcom Holdings Limited, Deregistered Company
  • Adrienne Liocadia Bushell, Lodged a claim as former director