β¨ Reliability Performance Measures
Reliability Performance Measures (Regulation 22)
1 Total number of Interruptions according to class
2004
2003
2002
2001
2000
Planned (Transpower)
3
3
3
1
0
Planned (TLC)
334
659
546
435
309
Unplanned (TLC)
497
587
375
447
357
Unplanned (Transpower)
4
2
9
5
7
Generation (Others)
0
0
0
2
0
Other (Private Lines)
24
0
0
0
0
Total
862
1251
933
890
673
2 Interruption targets for the following year
3 and for the subsequent four financial years
2005
2006
2007
2008
2009
Average 2005/09
Planned (TLC)
450
450
450
450
450
450
Unplanned (TLC)
398
386
373
360
348
373
4 Percentage of total number for faults not restored in 3 or 24 hours
Unplanned (TLC) faults for 2003/04 restored in 3 or 24 hours
Number
% of Outages
Not Restored in 3 hours
138
28%
Not Restored in 24 hours
5
1%
5a Total number of faults per 100km of lines for:
Faults per 100km
2004
2003
2002
2001
33kV
14.6
15.7
7.4
9.9
11kV
11.7
14.0
7.0
7.8
Total
12.0
14.2
7.1
8.0
5b Target for the following year
5c and the subsequent 4 financial years
Faults per 100km
2005
2006
2007
2008
2009
Average 2005/09
33kV
10.5
10.1
9.7
9.2
8.8
9.7
11kV
9.5
9.2
8.9
8.6
8.4
8.9
Total
9.6
9.3
9.0
8.7
8.4
9.0
6a Total number of faults per 100km of underground lines for:
Faults per 100km
2004
2003
2002
2001
33kV
0.0
0.0
0.0
0.0
11kV
6.9
6.9
2.7
3.3
Total
6.9
6.9
2.7
3.3
6b Target for the following year
6c and the subsequent 4 financial years
Faults per 100km
2005
2006
2007
2008
2009
Average 2005/09
33kV
0.0
0.0
0.0
0.0
0.0
0.0
11kV
4.6
4.6
3.5
2.3
2.3
3.5
Total
4.6
4.6
3.5
2.3
2.3
3.5
7a Total number of faults per 100km of overhead lines for:
Faults per 100km
2004
2003
2002
2001
33kV
14.6
15.7
7.4
9.9
11kV
11.8
14.2
7.1
7.9
Total
12.1
14.3
7.2
8.1
7b Target for the following year
7c and the subsequent 4 financial years
Faults per 100km
2005
2006
2007
2008
2009
Average 2005/09
33kV
10.5
10.1
9.7
9.2
8.8
9.7
11kV
9.6
9.3
9.1
8.8
8.5
9.1
Total
9.7
9.4
9.1
8.8
8.5
9.1
Next Page →
Online Sources for this page:
β¨ LLM interpretation of page content
π°
Statement of Financial Performance Disclosure
(continued from previous page)
Domain π° Finance & Revenue
Keywords Financial performance, Revenue, Expenditure, The Lines Company Limited, Related party transactions, Efficiency performance measures, Electricity, Energy delivery, Load Factor, Loss Ratio, Capacity Utilisation, System lengths, Circuit length, Transformer capacity, Maximum demand, Total electricity supplied, Total electricity conveyed, Total customers