✨ Electricity Performance Measures
31 AUGUST 2005
NEW ZEALAND GAZETTE, No. 151
3717
ELECTRICITY INVERCARGILL LIMITED LINE BUSINESS
ENERGY EFFICIENCY PERFORMANCE MEASURES
PURSUANT TO REQUIREMENT 20 OF THE ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS 2004, SCHEDULE 1 PART 4
| Energy Delivery Efficiency Performance Measures Years Ending 31 March 2002, 2003, 2004 and 2005 | 2005 | 2004 | 2003 | 2002 |
|---|---|---|---|---|
| Load Factor (Percentage of electrical energy entering the transmission system over maximum demand times hours per year.) | 53.4% | 52.6% | 54.4% | 48.6% |
| Loss Ratio (Transmission losses over energy entering the system) | 7.4% | 8.3% | 9.7% | 11.0% |
| Capacity Utilisation (Maximum demand over total transformer capacity) | 42.0% | 42.3% | 42.1% | 44.1% |
The loss ratio is derived from electricity supplied information provided by other parties. Electricity Invercargill Limited is unable to audit this information and is not confident with its accuracy and estimates the losses at 4.0%.
Statistics
| 66kV | 33kV | 22kV | 11kV | 6.6kV | 400V | Total | |
|---|---|---|---|---|---|---|---|
| System Length (km’s) | 2001/02 | - | 23 | - | 180 | - | 485 |
| 2002/03 | - | 23 | - | 181 | - | 489 | |
| 2003/04 | - | 25 | - | 199 | - | 452 | |
| 2004/05 | - | 26 | - | 199 | - | 454 | |
| Overhead Lines (km’s) | 2001/02 | - | 0.8 | - | 42 | - | 76 |
| 2002/03 | - | 1.0 | - | 39 | - | 67 | |
| 2003/04 | - | 1.0 | - | 36 | - | 55 | |
| 2004/05 | - | 1.4 | - | 35 | - | 52 | |
| Underground Cables (km’s) | 2001/02 | - | 22 | - | 138 | - | 409 |
| 2002/03 | - | 22 | - | 143 | - | 422 | |
| 2003/04 | - | 24 | - | 163 | - | 397 | |
| 2004/05 | - | 25 | - | 164 | - | 402 |
| TX Capacity | Maximum Demand | Electricity Supplied | Electricity Conveyed | Total Customers | |
|---|---|---|---|---|---|
| 2001/02 | 140,770 | 62,113 | 264,562,646 | 235,363,540 | 16,847 |
| 2002/03 | 141,915 | 59,686 | 284,541,935 | 257,047,355 | 16,961 |
| 2003/04 | 142,125 | 60,070 | 276,531,554 | 253,538,024 | 16,922 |
| 2004/05 | 144,415 | 60,611 | 283,589,781 | 262,530,504 | 16,842 |
Electricity Conveyed for Retailers and The Power Company Limited
| 2005 kWh | 2004 kWh | 2003 kWh | 2002 kWh | |
|---|---|---|---|---|
| Retailer A | 200,772,249 | 191,835,995 | 186,623,868 | 175,477,077 |
| Retailer B | 3,458,864 | 3,744,172 | 7,964,609 | 4,914,775 |
| Retailer C | 38,832,367 | 39,099,074 | 34,605,351 | 22,741,371 |
| Retailer D | 1,031,124 | 1,066,856 | 1,597,380 | 3,486,775 |
| The Power Company Limited OCB46 | 6,559,573 | 6,196,189 | 6,464,423 | 5,981,473 |
| Retailer E | - | - | - | 7,284,490 |
| Retailer F | 11,876,327 | 11,595,738 | 19,791,724 | 15,477,579 |
| TOTAL | 262,530,504 | 253,538,024 | 257,047,355 | 235,363,540 |
The Electricity Conveyed details are provided by other parties. Electricity Invercargill Limited is unable to audit this information and is not confident with its accuracy.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 151
Gazette.govt.nz —
NZ Gazette 2005, No 151
✨ LLM interpretation of page content
🏭
Electricity Invercargill Limited Line Business Energy Efficiency Performance Measures
(continued from previous page)
🏭 Trade, Customs & IndustryElectricity, Energy Efficiency, Performance Measures, Load Factor, Loss Ratio, Capacity Utilisation, Invercargill