✨ Electricity Reliability Performance




Vector Limited

Electricity Lines Business

Reliability Performance Measures to be Disclosed by Disclosing Entities (Other Than Transpower) (continued)

For the year ended 31 March 2005

SCHEDULE 1 – PART 5 (CONTINUED)

CAIDI

  1. The CAIDI for the total of all interruptions
2005 2004 2003 2002
66.62 70.05 60.61 53.89
  1. CAIDI targets for the following financial year
2006
(a) Planned (class B)
(b) Unplanned (class C)
  1. Average CAIDI targets
2006-2010
(a) Planned (class B)
(b) Unplanned (class C)
  1. The CAIDI for the total number of interruptions within each interruption class
2005 2004 2003 2002
Class A - 439.00 75.00 -
Class B 164.25 174.18 186.75 107.55
Class C 70.05 68.40 56.55 64.24
Class D 10.88 40.93 13.19 20.38
Class E - - - -
Class F - - - -
Class G - - - -
Class H - - - -
Class I - - - -

Description of interruption classes as per The Electricity Information Disclosure Requirements 2004

  • Class A Planned interruption by Transpower
  • Class B Planned interruption by the principal
  • Class C An unplanned interruption originating within the principal disclosing entity, where those works are used for carrying out lines business activities
  • Class D An unplanned interruption originating within the works of Transpower, where those works are used for carrying out line business activities
  • Class E An unplanned interruption originating within works used, by the principal disclosing entity, for the generation of electricity
  • Class F An unplanned interruption originating within works used, by persons other than the principal disclosing entity, for the generation of electricity
  • Class G An unplanned interruption caused by another disclosing entity
  • Class H A planned interruption caused by another disclosing entity
  • Class I An interruption not referred to in classes A to H


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 147


Gazette.govt.nz PDF NZ Gazette 2005, No 147





✨ LLM interpretation of page content

🏭 Vector Limited's Reliability Performance Measures (continued from previous page)

🏭 Trade, Customs & Industry
Electricity, Reliability, Performance Measures, CAIDI, Vector Limited