β¨ Electricity Efficiency Performance Measures
Buller Electricity Limited
Line Business Performance Measures
Disclosure of energy delivery efficiency performance measures under requirement 20 of the Electricity Information Disclosure Requirements 2004.
-
Energy Delivery efficiency performance measures:
(a) Load Factor (=a/bc100)
2004 2003 2002 2001 64% 63%* 63%* 66%* a = kWh of electricity entering system
2004 2003 2002 2001 44,037,981 42,764,385* 44,532,248* 45,436,591* b = Maximum demand
2004 2003 2002 2001 7,820 7,749* 8,062* 7,844* c = Total number of hours in year
2004 2003 2002 2001 8,784 8,760 8,760 8,760 (b) Loss Ratio (=a/b*100)
2004 2003 2002 2001 8.98% 11.44%* 9.63%* 8.55%* a = losses in electricity in kWh
2004 2003 2002 2001 3,955,387 4,893,797* 4,289,870* 3,882,796* b = kWh of electricity entering system
2004 2003 2002 2001 44,037,981 42,764,385* 44,532,248* 45,436,591* (c) Capacity Utilisation (=a/b*100)
2004 2003 2002 2001 27% 27%* 29%* 29%* a = Maximum demand
2004 2003 2002 2001 7,820 7,749* 8,062* 7,844* b = Transformer Capacity
2004 2003 2002 2001 28,550 28,775 27,650 27,380 -
Statistics:
(a) System Length
Circuit Kilometres 2004 2003 2002 2001 110kV 1 0 0 0 33kV 103 111 111 111 11kV 374 357 355 350 400V 130 130 129 131 Total 608 598 595 592 (b) System Length Overhead
Circuit Kilometres 2004 2003 2002 2001 110kV 1 0 0 0 33kV 103 111 111 111 11kV 370 351 350 346 400V 118 118 117 119 Total Overhead 592 580 578 576 (c) System Length Underground
Circuit Kilometres 2004 2003 2002 2001 110kV 0.0 0.0 0.0 0.0 33kV 0.2 0.2 0.2 0.2 11kV 4.2 5.0 4.7 4.4 400V 11.8 11.6 11.5 11.5 Total Underground 16.2 16.8 16.4 16.1 (d) Transformer Capacity (In Kilovolt Amperes)
2004 2003 2002 2001 28,550 28,775 27,650 27,380 (e) Maximum Demand (kW)
2004 2003 2002 2001 7,820* 7,749* 8,062* 7,844*
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 14
Gazette.govt.nz —
NZ Gazette 2005, No 14
β¨ LLM interpretation of page content
π
Buller Electricity Limited Line Business Performance Measures
(continued from previous page)
π Trade, Customs & IndustryPerformance Measures, Energy Delivery, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Transformer Capacity, Maximum Demand, Buller Electricity Limited