Energy Performance Statistics




22 AUGUST 2005 NEW ZEALAND GAZETTE, No. 134 3285

Average SAIDI targets (next 5 years)

2006/10 2005/09 2004/08 2003/07
Class B – Planned 16 20 20 17
Class C – Unplanned 62 80 80 73
Total 78 100 100 90

SAIFI

2005 2004 2003 2002
Class A – Planned by Transpower - - - -
Class B – Planned by Electra 0.09 0.07 0.04 0.13
Class C – Unplanned by Electra 1.47 2.65 0.86 1.18
Class D – Unplanned by Transpower 0.39 0.78 0.34 0.08
Class E – Unplanned by embedded generation - - - -
Class F – Unplanned by generation on other network - - - -
Class G – Unplanned by other line owner - - - -
Class H – Planned by other line owner - - - -
Class I – Any other loss of supply - - - -
Total 1.95 3.50 1.24 1.39

SAIFI targets (next year)

2006 2005 2004 2003
Class B – Planned 0.16 0.2 0.2 0.13
Class C – Unplanned 1.42 1.8 1.8 1.47
Total 1.58 2.0 2.0 1.60

Average SAIFI targets (next 5 years)

2006/10 2005/09 2004/08 2003/07
Class B – Planned 0.16 0.18 0.18 0.10
Class C – Unplanned 1.42 1.80 1.80 1.20
Total 1.58 1.98 1.98 1.30

CAIDI

2005 2004 2003 2002
Class A – Planned by Transpower - - - -
Class B – Planned by Electra 169.22 143.17 139.52 133.3
Class C – Unplanned by Electra 42.84 40.75 58.03 40.9
Class D – Unplanned by Transpower 14.51 20.0 17.0 6.0
Class E – Unplanned by embedded generation - - - -
Class F – Unplanned by generation on other network - - - -
Class G – Unplanned by other line owner - - - -
Class H – Planned by other line owner - - - -
Class I – Any other loss of supply - - - -
Total 43.01 38.13 49.64 47.7

LexisNexis



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 134


Gazette.govt.nz PDF NZ Gazette 2005, No 134





✨ LLM interpretation of page content

🌾 Energy delivery performance measures and system statistics (continued from previous page)

🌾 Primary Industries & Resources
Energy, Faults, Performance measures, System reliability, Statistics, SAIDI, SAIFI, CAIDI