β¨ Electricity Reliability Performance Measures
3056
NEW ZEALAND GAZETTE, No. 126
16 AUGUST 2005
MAINPOWER NEW ZEALAND LTD
DISCLOSURE OF RELIABILITY PERFORMANCE MEASURES
PURSUANT TO THE COMMERCE ACT (ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS) NOTICE 2004, REQUIREMENT 21, PART 4.
Disclosure for Statistics Year Ending 31/03/2005
Requirement 21(1)
- Total number of interruptions, together with a breakdown of that total according to interruption class
| NETWORK OR GENERATION OWNER | Disc Reg Class | CLASSIFICATION OF INTERRUPTIONS | |
|---|---|---|---|
| MainPower | B C + G | Planned Shut-downs Unplanned Interruptions Subtotal | 236 58 294 |
| Trans Power | A D | Planned Shut-downs Unplanned Interruptions Subtotal | 1 2 3 |
| Other ECNZ | G E | Other Interruptions Unplanned Interruptions Subtotal TOTAL | 297 |
-
Interruption targets for the following financial year for-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C). -
Average interruption targets for the following financial year and the subsequent 4 financial years for each of-
(a) Planned interruptions by the line owner (Class B); and
(b) Unplanned interruptions originating within the works of the line owner (Class C).
| Class B Interruptions | Class C Interruptions | |
|---|---|---|
| Target 31/03/06 | 160 | 65 |
| 31/03/2006 Avg forecast | 165 | 60 |
| 31/03/2007 Avg forecast | 155 | 60 |
| 31/03/2008 Avg forecast | 150 | 58 |
| 31/03/2009 Avg forecast | 145 | 56 |
- The proportion {expressed as a percentage} of the total number of Class C interruptions not restored within-
(a) 3 hours; and
(b) 24 hours.
| Not restored within 3 hours- % of Class C | Not restored within 24 hours- % of Class C |
|---|---|
| 25.8% | 0% |
-
With respect to faults per 100 circuit kilometres of prescribed voltage electric line, the following information:
(a) The total number of faults; and
(b) The total number of faults targeted for the following financial year; and
(c) The average total number of faults for that financial year and the subsequent 4 financial years; and
(d) A breakdown of the fault information in accordance with paragraphs (a) to (c) by different nominal line voltages. -
The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line, together with a breakdown of that total according to different nominal line voltages.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 126
Gazette.govt.nz —
NZ Gazette 2005, No 126
β¨ LLM interpretation of page content
π
MainPower New Zealand Ltd Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryElectricity reliability, Interruption statistics, Fault rates, Performance targets, Energy distribution