β¨ Electricity Performance Measures
Buller Electricity Limited
Line Business Performance Measures
Disclosure of reliability performance measures under requirement 21 of the Electricity Information Disclosure Requirements 2004.
| 2005 | 2004 | 2003 | 2002 |
|---|
1 Total Number of Interruptions
Class A - Planned by Transpower | 0 | 0 | 0 | 0
Class B - Planned by Line Owners | 24 | 44 | 29 | 8
Class C - Unplanned by Line Owners | 32 | 34 | 44 | 63
Class D - Unplanned by Transpower | 0 | 0 | 0 | 0
Class E - Unplanned by ECNZ | 0 | 0 | 0 | 0
Class F - Unplanned by other generation | 0 | 0 | 0 | 0
Class G - Any Other Loss of Supply | 0 | 1 | 1 | 0
Class H - Planned - by another Line Owner | 0 | 0 | 0 | 0
Class I - Any Other Loss of Supply | 1 | 0 | 0 | 0
Total | 57 | 79 | 74 | 71
2 Interruption Targets for 2005/2006
Class B - Planned by Line Owners | 40
Class C - Unplanned by Line Owners | 32
3 Average Interruption Targets for 2006/2010
Class B - Planned by Line Owners | 35
Class C - Unplanned by Line Owners | 26
4 Proportion of Class C Interruptions not restored within:
3 Hours | 12
24 Hours | 0
5 (a) The total number of faults per 100 circuit kilometres of prescribed voltage electric line
| 2005 | 2004 | 2003 | 2002 | |
|---|---|---|---|---|
| 11kV | 8.7 | 7.5 | 10.9 | 16.9 |
| 33kV | 2.0 | 3.9 | 4.5 | 3.6 |
| Total | 7.1 | 6.7 | 9.4 | 13.7 |
(b) Target for 2005/2006 year
11kV | 6.0
33kV | 4.0
Total | 5.5
(c) Average Target for 2006/2010 years
11kV | 5.2
33kV | 3.2
Total | 4.7
6 The total number of faults per 100 circuit kilometres of underground prescribed voltage electric line
| 2005 | 2004 | 2003 | 2002 | |
|---|---|---|---|---|
| 11kV | 0 | 0 | 0 | 21.3 |
| 33kV | 0 | 0 | 0 | 0 |
| Total | 0 | 0 | 0 | 20.5 |
7 The total number of faults per 100 circuit kilometres of overhead prescribed voltage electric line
| 2005 | 2004 | 2003 | 2002 | |
|---|---|---|---|---|
| 11kV | 8.5 | 7.5 | 11.1 | 16.9 |
| 33kV | 1.8 | 3.9 | 4.5 | 3.6 |
| Total | 6.9 | 6.7 | 9.5 | 13.7 |
Note: The totals in clauses 5, 6 and 7 are not designed to sum the figures above each total.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 122
Gazette.govt.nz —
NZ Gazette 2005, No 122
β¨ LLM interpretation of page content
π
Buller Electricity Limited Line Business Performance Measures
(continued from previous page)
π Trade, Customs & IndustryElectricity Delivery, Reliability Performance, Interruptions, Faults, Performance Targets, Electricity Statistics