2936 NEW ZEALAND GAZETTE, No. 121 10 AUGUST 2005
Faults
Faults per 100 circuit kilometres of prescribed voltage electric line
Input faults for each nominal voltage
| Faults | Average Faults Targets 2006/10 | Faults Targets 2006 | Actual number of faults |
|---|---|---|---|
| 2005 | |||
| -------- | ------------------------------- | --------------------- | ----- |
| Nominal | Voltage | ||
| 110kV | 0 | 0 | |
| 66kV | 0 | 0 | |
| 50kV | 0 | 0 | |
| 33kV | 6.0 | 6.5 | 5.8 |
| 22kV | 6.5 | 6.5 | 6.8 |
| 11kV | 7.2 | 7.2 | 6.8 |
| 6.6kV | 0 | 0 | |
| 3.3kV | 0 | 0 | |
| 230/400 V | 0 | 0 | |
| Other | 0 | 0 | |
| Other | 0 | 0 | |
| Other | 0 | 0 | |
| Total | 7.0 | 7.0 | 6.7 |
Faults per 100 circuit kilometres of underground prescribed voltage electric line
| Nominal | | Actual number of faults |
| Voltage | |-------------------------|
| | | 2005 | 2004 | 2003 | 2002 |
|---------|-----------------------|-----|------|------|------|
| 110kV | | 0 | 0 | 0 | 0 |
| 66kV | | 0 | 0 | 0 | 0 |
| 50kV | | 0 | 0 | 0 | 0 |
| 33kV | | 0 | 0 | 0 | 0 |
| 22kV | | 0 | 0 | 0 | 0 |
| 11kV | | 0 | 0 | 2.7 | 2 |
| 6.6kV | | 0 | 0 | 0 | 0 |
| 3.3kV | | 0 | 0 | 0 | 0 |
| 230/400 V | | 0 | 0 | 0 | 0 |
| Other | | 0 | 0 | 0 | 0 |
| Other | | 0 | 0 | 0 | 0 |
| Other | | 0 | 0 | 0 | 0 |
| Total | | 0 | 0 | 1.4 | 2 |
Faults per 100 circuit kilometres of overhead prescribed voltage electric line
| Nominal | | Actual number of faults |
| Voltage | |-------------------------|
| | | 2005 | 2004 | 2003 | 2002 |
|---------|-----------------------|-----|------|------|------|
| 110kV | | 0 | 0 | 0 | 0 |
| 66kV | | 0 | 0 | 0 | 0 |
| 50kV | | 0 | 0 | 0 | 0 |
| 33kV | | 5.9 | 8.7 | 7.0 | 11 |
| 22kV | | 7.0 | 9.3 | 5.2 | 2 |
| 11kV | | 7.3 | 8.4 | 7.3 | 6 |
| 6.6kV | | 0 | 0 | 0 | 0 |
| 3.3kV | | 0 | 0 | 0 | 0 |
| 230/400 V | | 0 | 0 | 0 | 0 |
| Other | | 0 | 0 | 0 | 0 |
| Total | | 7.1 | 8.5 | 7.0 | 6 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2005, No 121
Gazette.govt.nz —
NZ Gazette 2005, No 121
β¨ LLM interpretation of page content
ποΈ
Counties Power Limited Electrical System Statistics
(continued from previous page)
ποΈ Infrastructure & Public WorksElectricity, System Length, Circuit Length, Transformer Capacity, Maximum Demand, Kilowatt Hours, Counties Power Limited