✨ Electricity Performance Metrics




3 AUGUST 2005
NEW ZEALAND GAZETTE, No. 115
2777

4 Fault Restoration Times (Class C) interruptions not restored within:

3 Hours      24.86%    17.29%    24.57%    32.68%
24 Hours     0.00%     0.00%     1.71%     0.65%

5 Number of faults per 100 km of prescribed voltage line

(a)  Total number of faults

    66 kV      0.6       0.0       3.1       3.8
    33 kV      2.8       3.5       1.3       1.6
    22 kV      7.7       18.0      16.3      14.1
    11 kV      7.3       8.1       14.0      6.3
    Total    6.5       7.8       11.0      5.9

(b)  Target for (next year)

    66 kV      1.0
    33 kV      3.0
    22 kV      8.0
    11 kV      10.0
    Total    6.0

(c)  Average Target (5 years)

    66 kV      1.0
    33 kV      3.0
    22 kV      8.0
    11kV       10.0
    Total    6.0

6 The total number of faults per 100km of prescribed voltage underground line

    66 KV      0         0         0         0
    33 kV      0         0         0         0
    22 kV      0         0         0         0
    11kV       1.0       3.2       2.2       0
    Total    0.9       1.0       0.7       0

7 The total number of faults per 100km of prescribed voltage overhead line

    66 kV      0.6       0.0       3.2       3.8
    33 kV      2.9       3.6       1.4       1.6
    22 kV      8.5       18.2      16.4      14.2
    11 kV      9.0       8.5       14.7      6.6
    Total    7.7       8.7       12.2      6.6

8 SAIDI for the total number of interruptions

    132.69    198.63    318.86    228.56

9 SAIDI targets (next year)

    Class B - Planned by Line Owner     93
    Class C - Unplanned by Line Owner    57


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 115


Gazette.govt.nz PDF NZ Gazette 2005, No 115





✨ LLM interpretation of page content

🌾 Electricity Ashburton Limited Performance Measures for 2005 (continued from previous page)

🌾 Primary Industries & Resources
Electricity, Performance measures, Fault restoration, Circuit length, Transformer capacity, Maximum demand, Electricity supply, Reliability, Interruptions, SAIDI