✨ Performance measures for Waipa Networks Limited




2422

NEW ZEALAND GAZETTE, No. 101

1 JULY 2005

WAIPA NETWORKS LIMITED - LINES BUSINESS

2005 2004 2003 2002
16 The CAIDI for the total number of interruption 65 88 59 97
17 CAIDI targets for 2005 / 2006
Class B - Planned - by Waipa Networks 250
Class C - Unplanned - by Waipa Networks 66
18 Average CAIDI Target for 2005 / 2006 to 2009 / 2010 years
Class B - Planned - by Waipa Networks 250
Class C - Unplanned - by Waipa Networks 64
19 The CAIDI for the total number of interruptions within each interruption class
Class A - Planned - by Transpower 0 366 0 0
Class B - Planned - by Waipa Networks 205 253 232 245
Class C - Unplanned - by Waipa Networks 50 57 50 76
Class D - Unplanned - by Transpower 100 37 8 35
Class E - Unplanned - by Line Owner genera 0 0 0 0
Class F - Unplanned - by other generation 0 0 0 0
Class G - Unplanned - by another line owner 63 35 65 92
Class H - Planned - by another line owner 0 0 0 0
Class I - Any other loss of supply 0 0 0 0


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 101


Gazette.govt.nz PDF NZ Gazette 2005, No 101





✨ LLM interpretation of page content

🏭 Performance measures for Waipa Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
Financial performance, Efficiency performance, Energy delivery, Waipa Networks Limited, Statistics, System Length, Transformer Capacity, Maximum Demand, Electricity conveyance, Retailers, SAIDI, SAIFI, Interruptions, Targets