✨ Energy Delivery Efficiency Report




17 JANUARY 2005 NEW ZEALAND GAZETTE, No. 10

227

MAINPOWER NEW ZEALAND LTD

DISCLOSURE OF ENERGY DELIVERED EFFICIENCY PERFORMANCE MEASURES AND STATISTICS

PURSUANT TO THE COMMERCE ACT (ELECTRICITY INFORMATION DISCLOSURE REQUIREMENTS) NOTICE 2004, REQUIREMENT 20, PART 4

For the Year Ended 31 March

2004 2003 2002 2001
  1. Energy Delivery Efficiency Performance Measures

(a) Load Factor

Electrical energy entering the distribution system
Maximum demand * Hours per year

| | 69.69% | 62.00% | 63.84% | 68.77% |

(b) Loss Ratio

Distribution losses
Energy entering the system

| | 4.56% | 5.90% | 6.02% | 5.84% |

(c) Capacity Utilisation

Maximum demand
Total transformer capacity

| | 24.02% | 28.25% | 26.54% | 27.30% |

  1. Statistics

(a) System length, by voltage:

Voltage Circuit Length Kms
2004
400/230 691
11000/22000 3,179
33000 310
Total 4,180

(b) Circuit length of overhead electric lines, by voltage:

Voltage Circuit Length Kms
2004
400/230 326
11000 3,047
33000 307
Total 3,680

(c) Circuit length of underground electric lines, by voltage:

Voltage Circuit Length Kms
2004
400/230 365
11000 132
33000 3
Total 500


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2005, No 10


Gazette.govt.nz PDF NZ Gazette 2005, No 10





✨ LLM interpretation of page content

🏭 Mainpower New Zealand Ltd Annual ODV Reconciliation Report (continued from previous page)

🏭 Trade, Customs & Industry
Financial Report, ODV Reconciliation, System Fixed Assets, Commerce Act, Electricity Information Disclosure

🏭 Disclosure of Energy Delivered Efficiency Performance Measures and Statistics

🏭 Trade, Customs & Industry
Energy Delivery, Efficiency Performance, Load Factor, Loss Ratio, Capacity Utilisation, System Length, Circuit Length, Overhead Electric Lines, Underground Electric Lines