✨ Energy Performance Statistics




TOP ENERGY LIMITED

Performance Measures and Statistics

For the Year Ended 31 March 2004

Regulation 22

Reliability Performance Measures
i. Total number of interruptions and breakdowns by interruption class
Class Type of Interruption 5 Yr Average Target 2005 2004 No 2003 No 2002 No 2001 No
A Planned - Transpower 0 2 0 0
B Planned - Top Energy 155 155 160 144 195 218
C Unplanned - Top Energy 190 210 219 249 244 235
D Unplanned - Transpower 1 0 6 0
E Unplanned - Embedded Generation 0 0 0 0
F Unplanned - Other Generation 0 0 0 0
G Unplanned - Another Line owner 0 0 0 0
H Planned - Another Line owner 0 0 0 0
I Any other interruptions 3 0 0 0
Total - All interruptions 383 395 447 453

Class C interruptions not restored:

  • a Within 3 hours: 42% | 30% | % | 34% | 27%
  • b Within 24 hours: 1% | 6% | % | 0% | 0%
ii. Number of faults per 100 circuit kms
Line Voltage Total Underground Overhead
2004 2003 2002
100kV
66kV
33kV 4.78 7.74 4.10
11kV 7.28 7.21 7.34
6.6kV
3.3kV
Total 7.06 7.25 7.11

| Target Faults: |
| 33kV | 5 Yr Average | 2005 Target |
| | 3.7 | 3.7 |
| 11kV | 6.4 | 7.4 |
| Total | 6.1 | 6.8 |

iii. Breakdown of statistics by interruption class
Class Type of Interruption SAIDI (Minutes) SAIFI (Interruptions) CAIDI (Minutes)
2004 2003 2002
A Planned - Transpower 0.0 0.0 148.0
B Planned - Top Energy 39.5 37.0 48.0
C Unplanned - Top Energy 311.9 382.0 287.0
D Unplanned - Transpower 1.5 0.0 191.0
E Unplanned - Embedded Generation 0.0 0.0 0.0
F Unplanned - Other Generation 0.0 0.0 0.0
G Unplanned - Another Line owner 0.0 0.0 0.0
H Planned - Another Line owner 0.0 0.0 0.0
I Any other interruption 0.0 0.0 0.0
Total - All interruptions 352.9 419.0 674.0

| Targets: | 5 Yr Average | Target 2005 |
| B Planned - Top Energy | 40 | 40 |
| C Unplanned - Top Energy | 270 | 280 |

| | SAIFI (Interruptions) | CAIDI (Minutes) |
| | 5 Yr Average | Target 2005 |
| | 0.3 | 0.3 |
| C Unplanned - Top Energy | 4.9 | 4.9 |
| | 133 | 133 |
| | 55 | 57 |



Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2004, No 173


Gazette.govt.nz PDF NZ Gazette 2004, No 173





✨ LLM interpretation of page content

🏭 Top Energy Limited Performance Measures and Statistics (continued from previous page)

🏭 Trade, Customs & Industry
Energy, Performance Measures, Reliability, Statistics, Faults, Interruptions