β¨ Energy Reliability Performance Measures
HORIZON ENERGY DISTRIBUTION LIMITED
Requirement 21 Reliability Performance Measures (Continued)
For the year ended 31 March 2004
| 2004 | 2003 | 2002 | 2001 | 2000 | |
|---|---|---|---|---|---|
| 6) Number of Faults per 100 km of Underground Prescribed Voltage Line | |||||
| 110 kV | - | - | - | - | - |
| 33 kV | - | - | - | 4.6 | 0.8 |
| 11 kV | 4.4 | 1.5 | 4.6 | - | - |
| Total Underground Faults / 100km | 4.4 | 1.4 | 4.4 | 0.7 | - |
| 7) Number of Faults per 100 km of Overhead Prescribed Voltage Line |
| 110 kV | 0.6 | 0.6 | 1.7 | 1.7 | 3.4 |
| 33 kV | - | - | - | - | 1.5 |
| 11 kV | 5.0 | 5.0 | 3.4 | 4.8 | 5.7 |
| Total Overhead Faults / 100km | 4.8 | 4.6 | 3.3 | 4.5 | 5.5 |
- SAIDI for Total Number of Interruptions |
| | 219 | 192 | 258 (1) | 129 | 205 |
(1) 100 minutes related to Tornado November 2001
| | 2005 | 2004 | 2003 | 2002 | 2001 | 2000 |
-
SAIDI Targets (Next Year) |
| (a) Planned interruptions (Class B) | 45 | 45 | 45 | 45 | 49 | 75 |
| (b) Unplanned interruptions (Class C) | 100 | 100 | 67 | 72 | 72 | 165 | -
Average SAIDI Targets (Next 5 Years) |
| (a) Planned interruptions (Class B) | 45 | | | | | |
| (b) Unplanned interruptions (Class C) | 100 | | | | | | -
SAIDI for Total Interruptions by Class |
| Class A - Transpower planned interruptions | 74 | - | 87 | 10 | - | - |
| Class B - Horizon planned interruptions | 25 | - | 20 | 35 | 41 | 49 |
| Class C - Horizon unplanned interruptions | 108 | - | 77 | 179 | 77 | 72 |
| Class D - Transpower unplanned interruptions| 12 | - | 8 | 44 | 2 | 80 |
| Class E - Horizon generation unplanned interruptions | - | - | - | - | - | 4 |
| Class F - Other generation unplanned interruptions | - | - | - | - | - | - |
| Class G - Other line owner unplanned interruptions | - | - | - | - | - | - |
| Class H - Other line owner planned interruptions | - | - | - | - | - | - |
| Class I - Not in A to H | - | - | - | - | - | - |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2004, No 172
Gazette.govt.nz —
NZ Gazette 2004, No 172
β¨ LLM interpretation of page content
π
Horizon Energy Distribution Limited's Reliability Performance Measures
(continued from previous page)
π Trade, Customs & IndustryReliability, Performance Measures, Interruptions, Faults, Energy Distribution