✨ Electricity Reliability Performance




NEW ZEALAND GAZETTE, No. 164

15 DECEMBER 2004

WAIPA NETWORKS LIMITED - LINES BUSINESS

2004 2003 2002 2001
16 The CAIDI for the total number of interruptions 83 59 97

17 CAIDI targets for 2004 / 2005

  • Class B - Planned - by Waipa Networks: 250
  • Class C - Unplanned - by Waipa Networks: 66

18 Average CAIDI Target for 2004 / 2005 to 2008 / 2009 years

  • Class B - Planned - by Waipa Networks: 250
  • Class C - Unplanned - by Waipa Networks: 64

19 The CAIDI for the total number of interruptions within each interruption class

Interruption Class 2004 2003 2002 2001
Class A - Planned - by Transpower 366 0 0 0
Class B - Planned - by Waipa Networks 253 232 245 215
Class C - Unplanned - by Waipa Networks 57 50 76 53
Class D - Unplanned - by Transpower 37 8 35 46
Class E - Unplanned - by Line Owner generation 0 0 0 0
Class F - Unplanned - by other generation 0 0 0 0
Class G - Unplanned - by another line owner 35 65 92 42
Class H - Planned - by another line owner 0 0 0 0
Class I - Any other loss of supply 0 0 0 0


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2004, No 164


Gazette.govt.nz PDF NZ Gazette 2004, No 164





✨ LLM interpretation of page content

🏭 Reliability Performance Measures of Waipa Networks Limited (continued from previous page)

🏭 Trade, Customs & Industry
15 December 2004
Reliability performance, Interruption statistics, Fault rates, Electricity supply, Waipa Networks Limited, Class A interruptions, Class B interruptions, Class C interruptions, Transpower, Line owner, Targets