NEW ZEALAND GAZETTE, No. 155
29 NOVEMBER 2004
3.2 ENERGY DELIVERY EFFICIENCY PERFORMANCE MEASURES AND STATISTICS
For the year ended 30 June 2004
Schedule 1 β PART 3
1 Energy delivery efficiency performance measures
a) Load factor
As calculated by the formula a/(12 x b) expressed as a percentage, where:
a = the amount of gas entering the system or systems during the financial year; and
b = the maximum monthly amount of gas entering the system or systems.
| System | July 2003 to June 2004 | January 2003 to June 2003^a^ | January 2002 to December 2002 | January 2001 to December 2001 |
|---|---|---|---|---|
| Alfriston | 47.10 | 51.14 | 44.59 | 37.02 |
| Ashhurst | - | - | 64.26^c^ | 56.27 |
| Auckland Central | 78.49 | 84.54 | 78.01 | 76.42 |
| Bruce McLaren^b^ | - | - | - | 78.52 |
| Dannevirke | - | - | 83.73^c^ | 78.40 |
| Drury | 64.48 | 66.69 | 68.65 | 61.15 |
| Feilding | - | - | 69.54^c^ | 66.16 |
| Foxton | - | - | 72.23^c^ | 68.32 |
| Hastings | - | - | 82.19^c^ | 77.66 |
| Hunua | 79.59 | 83.59 | 84.28 | 79.53 |
| Kakariki | - | - | 86.53^c^ | 80.88 |
| Kairanga | - | - | 28.87^c^ | 22.06 |
| Kingseat | 40.46 | 45.16 | 51.09 | 34.52 |
| Levin | - | - | 74.15^c^ | 64.19 |
| Longburn | - | - | 49.98^c^ | 48.91 |
| Mangaroa | - | - | - | - |
| Mangatainoka | - | - | 81.94^c^ | 81.97 |
| Oroua Downs | - | - | 17.20^c^ | 13.01 |
| Pahiatua | - | - | 69.70^c^ | 74.22 |
| Palmerston North | - | - | 64.76^c^ | 55.60 |
| Pukekohe | 73.50 | 74.43 | 73.39 | 68.74 |
| Ramarama | 54.59 | 54.57 | 53.42 | 48.11 |
| Takapau | - | - | 74.45^c^ | 78.25 |
| Tuakau | 58.59 | 68.66 | 69.34 | 65.92 |
| Waimauku^b^ | - | - | - | - |
| Waitoki^d^ | 19.83 | - | - | - |
| Waiuku^b^ | - | - | - | 49.18 |
| Wellington | - | - | 63.07^c^ | 57.20 |
^a^ As there is only six months data (Jan03-Jun03) the formula a/(6 x b) is used.
^b^ During 2002 the Waimauku and Waiuku gates were removed. Bruce McLaren has been interconnected with other Auckland Central Networks.
^c^ UnitedNetworks sold the gas pipelines in Hawkes Bay, Palmerston North and Wellington to PowerCo effective from 1 November 2002. This has affected the formula, a/(10 x b) has been used.
^d^ On 18 February 2004 the Waitoki system was connected to the NGC distribution system in the Whangaparaoa. Prior to this the system was supplied by means of the Auckland Central system.
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2004, No 155
Gazette.govt.nz —
NZ Gazette 2004, No 155
β¨ LLM interpretation of page content
π
Vector Limited Financial and Efficiency Performance Measures
(continued from previous page)
π Trade, Customs & IndustryFinancial Performance, Efficiency Measures, Accounting Return, Direct Line Costs, Indirect Line Costs, Vector Limited, UnitedNetworks Limited
π Energy Delivery Efficiency Performance Measures and Statistics
π Trade, Customs & IndustryEnergy Delivery, Load Factor, Gas Systems, Performance Measures, Statistics