WAIPA NETWORKS LIMITED - LINES BUSINESS

2003 2002 2001 2000

18 PERFORMANCE MEASURES

Disclosure of financial performance measures and efficiency performance measures under regulation 15 of the Electricity (Information Disclosure) Regulations 1999 as amended by the Electricity (Information Disclosure) Amendment Regulations 2000.

  1. Financial performance measures

    (a) Return on funds

    2.94% | 3.25% | 8.61% | 7.28%

    (b) Return on equity

    0.93% | 1.06% | 5.27% | 4.75%

    (c) Return on investment

    1.90% | 2.02% | 10.44% | 4.58%

  2. Efficiency performance measures:

    (a) Direct line costs per kilometre

    $1,090 | $821 | $793 | $842

    Direct Expenditure

    $1,927,280 | $1,448,878 | $1,387,316 | $1,586,594

    System Length

    1,768 | 1,764 | 1,749 | 1,885

    (b) Indirect line costs per electricity customer

    $54 | $54 | $54 | $52

    Indirect Expenditure

    $1,107,857 | $1,093,645 | $1,086,717 | $1,022,052

    Total consumers

    20,510 | 20,293 | 20,050 | 19,824

Disclosure of energy delivery efficiency performance measures under regulation 21 of the Electricity (Information Disclosure) Regulations 1999 as amended by the Electricity (Information Disclosure) Amendment Regulations 2000.

  1. Energy Delivery efficiency performance measures:

    (a) Load factor (=a/bc100)

    66.79 | 65.23 | 62.41 | 60.33

    a = kWh of electricity entering system

    323,000,166 | 320,374,899 | 302,279,611 | 295,531,204

    b = Maximum demand

    55,206 | 56,064 * | 55,290 | 55,766

    c = Total number of hours in year

    8,760 | 8,760 | 8,760 | 8,784

    • Restated to adjust for Transpower metering error.

    (b) Loss ratio (=a/b*100)

    6.23 | 6.19 | 6.40 | 6.69

    a = losses in electricity in kWh

    20,113,092 | 19,821,669 | 19,341,474 | 19,769,798

    b = kWh of electricity entering system

    323,000,166 | 320,374,899 | 302,279,611 | 295,531,204

    • Restated to adjust for Transpower metering error.

    (c) Capacity utilisation (=a/b*100)

    33.51 | 34.97 * | 35.41 | 37.29

    a = Maximum demand

    55,206 | 56,064 * | 55,290 | 55,766

    b = Transformer Capacity

    164,753 | 160,298 | 156,163 | 149,534

    • Restated to adjust for Transpower metering error.


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 79


Gazette.govt.nz PDF NZ Gazette 2003, No 79





✨ LLM interpretation of page content

πŸ’° Financial Statements Disclosure for Waipa Networks Limited (continued from previous page)

πŸ’° Finance & Revenue
Financial Statements, Disclosure, Equity, Operating Revenue, Operating Expenditure, Waipa Networks Limited