Electricity Reliability Performance Measures




VECTOR Limited

Electricity Lines Business

Reliability Performance Measures To Be Disclosed By Lines Owners (Other Than Transpower)

For the year ended 31 March 2002

FIRST SCHEDULE – PART 5

  1. Average interruptions targets

2003–2007

(a) Planned (class B) 13
(b) Unplanned (class C) 261

  1. Faults per 100 circuit kilometres of prescribed voltage electric lines

2003–2007

(c) The average number of faults 7.67

(d) Breakdown of (a) to (c) according to line voltage:

6.6kV 11kV 22kV 33kV 110kV Total
2003–2007 1.83 8.51 4.43 2.35 5.24 7.67
  1. Average SAIDI targets

2003–2007

(a) Planned (class B) 0.50
(b) Unplanned (class C) 38.25

  1. Average SAIFI targets

2003–2007

(a) Planned (class B) 0.00
(b) Unplanned (class C) 0.85

  1. The SAIFI for the total interruptions within each interruption class
Class 2002 2001 2000 1999
A -- -- -- --
B 0.01 0.00 0.02 0.03
C 0.79 0.99 0.99 1.16
D 0.25 0.02 0.13 0.07
E -- -- -- --
F -- -- -- --
G -- -- -- --
H -- -- -- --
I -- -- -- --


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 74


Gazette.govt.nz PDF NZ Gazette 2003, No 74





✨ LLM interpretation of page content

🏗️ Reliability Performance Measures for Vector Limited's Electricity Lines Business (continued from previous page)

🏗️ Infrastructure & Public Works
Electricity, Reliability, Performance Measures, Interruptions, Faults, SAIDI, SAIFI