Energy Performance Statistics




27 JUNE

NEW ZEALAND GAZETTE

1933


Average SAIDI targets (next 5 years)

2003/07
Class B – Planned 17
Class C – Unplanned 73
Total 90

SAIFI

2002 2001 2000 1999
Class A – Planned by Transpower
Class B – Planned by Electra 0.13 0.22 0.21 0.15
Class C – Unplanned by Electra 1.18 1.90 1.85 1.37
Class D – Unplanned by Transpower 0.08 0.39 0.81
Class E – Unplanned by embedded generation
Class F – Unplanned by generation on other network
Class G – Unplanned by other line owner
Class H – Planned by other line owner
Class I – Any other loss of supply
Total 1.39 2.51 2.06 2.33

SAIFI targets (next year)

2002/03
Class B – Planned 0.13
Class C – Unplanned 1.47
Total 1.60

Average SAIFI targets (next 5 years)

2003/07
Class B – Planned 0.10
Class C – Unplanned 1.20
Total 1.30

CAIDI

2002 2001 2000 1999
Class A – Planned by Transpower
Class B – Planned by Electra 133.3 101.5 113.8 133.0
Class C – Unplanned by Electra 40.9 43.2 40.9 34.3
Class D – Unplanned by Transpower 6.0 95.9 17.3
Class E – Unplanned by embedded generation
Class F – Unplanned by generation on other network
Class G – Unplanned by other line owner
Class H – Planned by other line owner
Class I – Any other loss of supply
Total 47.7 56.5 48.3 34.5


Next Page →



Online Sources for this page:

VUW Te Waharoa PDF NZ Gazette 2003, No 74


Gazette.govt.nz PDF NZ Gazette 2003, No 74





✨ LLM interpretation of page content

🏗️ Energy Delivery Performance Measures and Statistics (continued from previous page)

🏗️ Infrastructure & Public Works
Energy delivery, Performance measures, Statistics, SAIDI, SAIFI, CAIDI, Faults, Circuit kilometres, Targets