✨ Energy Reliability Performance Measures
Reliability Performance Measure Targets
Total interruptions
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| Class A – Planned by Transpower | – | – | – | – |
| Class B – Planned by Electra | 87 | 97 | 82 | 111 |
| Class C – Unplanned by Electra | 66 | 104 | 87 | 120 |
| Class D – Unplanned by Transpower | 1 | 1 | – | 2 |
| Class E – Unplanned by embedded generation | – | – | – | – |
| Class F – Unplanned by generation on other network | – | – | – | – |
| Class G – Unplanned by other line owner | – | – | – | – |
| Class H – Planned by other line owner | – | – | – | – |
| Class I – Any other loss of supply | – | – | – | – |
| Total | 154 | 202 | 169 | 233 |
Interruptions Target for Following Financial Year
| 2003 | |
|---|---|
| Class B – Planned | 75 |
| Class C – Unplanned | 95 |
| Total | 170 |
Average Interruptions Targets (next and subsequent 4 years)
| 2003/07 | |
|---|---|
| Class B – Planned | 70 |
| Class C – Unplanned | 86 |
| Total | 164 |
Proportion of the total Class C interruptions not restored within:
a) 3 hours - 0%
b) 24 hours - 0%
Number of Faults per 100 Circuit Kilometre
| 2002 | 2001 | 2000 | 1999 | |
|---|---|---|---|---|
| 33kV | 2.21 | 3.83 | 4.68 | 2.94 |
| 11kV | 6.01 | 9.23 | 8.07 | 12.48 |
| Total number of faults | 5.45 | 8.42 | 7.56 | 11.05 |
Next Page →
Online Sources for this page:
VUW Te Waharoa —
NZ Gazette 2003, No 74
Gazette.govt.nz —
NZ Gazette 2003, No 74
✨ LLM interpretation of page content
🏗️
Energy Delivery Performance Measures and Statistics
(continued from previous page)
🏗️ Infrastructure & Public WorksEnergy delivery, Performance measures, Statistics, System lengths, Transformer capacity, Maximum demand, Electricity, Customers, Interruptions, Faults